Cascades Tower, 4 Westferry Road, London E14 Data via plota.co.uk

PA/26/00928/NC - Full Planning Permission Approved

Proposal

Installation of 2no. new 22kWh twin pod EV charging points to Cascades and Quayside car park area. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Jul 2026
✓
Consultation
6 Aug 2026
✓
Approved
14 Sept 2026

Approved on 14 Sept 2026 · Delegated · Last checked 15 Sept 2026

Site constraints 12

2 listed buildings within 150 m of the postcode pin
Nearest: Cascades, Grade II, the postcode pin is inside its outline · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, about 1981 m); London Strategic Heat Main Project (at pre-application, about 1670 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area: Tower Hamlets APA 3.1
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Thames Path about 14 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Flood defence about 18 m from the postcode pin (wall, designed for a 1 in 1000 year flood); Inside the Tower Hamlets built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Priority habitat about 48 m away: Mudflats; Town centre about 84 m away: Canary Wharf.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
E14 8FQ
Received
20 Jul 2026
Validated
20 Jul 2026
Ward
Canary Wharf
Case officer
Show
Target decision
14 Sept 2026
Decision
Permit
Decision date
14 Sept 2026
Decision level
Delegated
Applicant
Show
Agent
GDA Surveying Ltd

How this decision compares

Decided in 56 days from validation, about the council's usual 56 days. Approved, as 85% of utility and infrastructure works here are.

67%decided within 8 weeks
85%approved
48decided in the last year

Plota live figures for utility and infrastructure works decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Comments by
28 Aug 2026
Site or press notice
6 Aug 2026
Statutory expiry
14 Sept 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026