20 Stakes Road, Waterlooville, PO7 5LX Data via plota.co.uk

APP/25/00882 - Consent under Tree Preservation Orders Approved

Proposal

Willow (T1) – Re-pollard back to established pruning points (2019) around 3-4m regrowth to maintain existing pollard framework in line with routine cyclical maintenance. Poplar (T2) - Re-pollard back to established pruning points (2019) around 4-5m regrowth to maintain existing pollard framework in line with routine cyclical maintenance. Trees subject to TPO 1810. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Oct 2025
✓
Approved
23 Dec 2025

Approved on 23 Dec 2025 · Delegated Decision · Last checked 10 Oct 2026

Site constraints 3

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project 141 m away: AQUIND Interconnector
The site is 141 m from the project boundary. Electricity line, awaiting the Secretary of State's decision. Also within 2 km: Hampshire Water Transfer and Water Recycling Project (accepted for examination, 1.5 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Waterlooville built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 4

Last sold for £122,000 in January 2019. Flat or maisonette, leasehold.

23 January 2019£122,000
30 May 2017£117,500
19 February 2007£109,000
25 April 2005£92,500New build

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area37 m² (398 sq ft)
Energy ratingC (71 out of 100)
PropertyEnclosed end-terrace maisonette, 2 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in September 2018, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Havant - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Havant
Application type
Consent under Tree Preservation Orders
Postcode
PO7 5LX
Received
27 Oct 2025
Validated
27 Oct 2025
Ward
Purbrook
Case officer
Show
Target decision
22 Dec 2025
Decision
Approve with Conditions
Decision date
23 Dec 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Bradley Street

How this decision compares

Decided in 57 days from validation, 5 days slower than Havant's median of 52 for tree and landscaping works. Approved, as 86% of tree and landscaping works here are.

56%decided within 8 weeks
86%approved
242decided in the last year

Plota live figures for tree and landscaping works decided by Havant in the last twelve months, from validation. Havant decision record →

Public comments

No public comments yet.

Last counted 10 Oct 2026

Read the comments on the council site ↗

Havant
Planning Authority Score
3/10
Poor
#235 of 296 overall
Relevant to this application:
Householder decisions

Havant is one of the slowest councils in England for householder decisions: #283 of 296 on speed. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Havant decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #39 of 296
95%
Householder approved
Above avg (90%) #78 of 296
31%
Decided in 8 weeks
Below avg (63%) #283 of 296
59%
Extended time limit
Above avg (41%) #264 of 296
82%
Minor dwellings approved
17 decided (1-9 homes)
57%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
21 decided
408
Total decisions
26 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.