PALE HALL HOTEL, Llandderfel, Y Bala, Gwynedd, LL23 7PS Data via plota.co.uk

C25/0273/04/LL - Full Planning Refused

Proposal

Codi 8 o gytiau bugail, gosod cynhwysydd dŵr budr a suddfan dŵr a seilwaith i wasanaethu’r cytiau bugail Erection of 8 no. shepherds huts, installation of foul water receptacle and soakaway and infrastructure to serve shepherds huts Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Apr 2025
✓
Validated
7 May 2026
✗
Refused
17 Sept 2026
Appeal
Not lodged

Refused on 17 Sept 2026 · Pwyllgor Cynllunio / Planning Committee · Last checked 1 Oct 2026

Planning committee

Decided by Gwynedd Planning Committee on 7 Sept 2026.

Refused

As officers recommended.

  • Officers advised refusal because the huts would be permanent accommodation in a Special Landscape Area, with unresolved environmental and flooding issues.
  • The committee voted to refuse the application because of planning policy, SAC, flood-risk and drainage concerns.
Read how the committee decided The proposal, site constraints, officers’ assessment, consultation responses, public comments, committee debate and reasons for refusal.

Source: Plota analysis of Gwynedd's committee minutes of 7 Sept 2026.

Documents 25

All documents on the council site ↗

Site constraints 7

Nutrient neutrality catchment: River Dee
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special area of conservation 229 m away: River Dee and Bala Lake / Afon Dyfrdwy a Llyn Tegid (Wales)
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI 229 m away: Afon Dyfrdwy (River Dee); Radon affected area, class 3; 1 listed building within 150 m; National park 496 m away: Snowdonia.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area60 m² (646 sq ft)
Energy ratingC (asset rating 61)
UseHotels
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in March 2024, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Gwynedd - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gwynedd
Application type
Full Planning
Postcode
LL23 7PS
Received
4 Apr 2025
Validated
7 May 2026
Ward
Llandderfel
Parish
Llandderfel
Case officer
Show
Target decision
18 Aug 2026
Decision
Refused
Decision date
17 Sept 2026
Decision level
Pwyllgor Cynllunio / Planning Committee
Applicant
Show
Agent
Caulmert Ltd
Freehold owner
Show

How this decision compares

Decided in 133 days from validation, 44 days slower than Gwynedd's median of 89 for agricultural works. Refused, as 17% of agricultural works here are.

31%decided within 8 weeks
83%approved
63decided in the last year

Plota live figures for agricultural works decided by Gwynedd in the last twelve months, from validation. Gwynedd decision record →

Consultation & key dates

Comments by
3 Aug 2026
Statutory expiry
18 Aug 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.