THE DINGLE Moggie Lane, Adlington, Macclesfield, Cheshire East, SK10 4NY Data via plota.co.uk

26/3419/HOUS - Householder Pending Consideration

Proposal

Single storey rear extension, single storey attached garage, the construction of an additional storey and alterations to the external appearance. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Sept 2026
✓
Validated
28 Sept 2026
Decision
Expected by 23 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision by 9 Dec 2026, from Cheshire East's recent extensions.

The consultation period closed on 29 Oct 2026.

Site constraints 9

Green belt: Merseyside and Greater Manchester
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Recorded mine shaft 33 m away
3 recorded mine entries within 50 m; the nearest is reference 392382-002. Building over or close to a mine entry should be avoided, even once it is capped.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature recovery project: Lost Wetlands; Inside the Poynton built-up area; Priority habitat 16 m away: Deciduous woodland; Flood defence 39 m away (natural high ground, designed for a 1 in 5 year flood); National infrastructure project 1.6 km away: Peak Cluster CCS Pipeline, at pre-application; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cheshire East - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder
Postcode
SK10 4NY
Received
17 Sept 2026
Validated
28 Sept 2026
Ward
Poynton East and Pott Shrigley
Parish
Adlington
Case officer
Show
Target decision
23 Nov 2026
Decision level
Delegation
Applicant
Show
Agent
JRConsulting

Decision outlook

Day 56 of the 56-day target. Cheshire East usually decides extensions by day 60.

Day 564 days to the predicted decision (day 60)
47%decided within 8 weeks
92%approved
1,699decided in the last year

Plota live figures for extensions decided by Cheshire East in the last twelve months, from validation. Cheshire East decision record →

Consultation & key dates

Comments by
29 Oct 2026
Statutory expiry
23 Nov 2026
Cheshire East
Planning Authority Score
1.9/10
Poor
#274 of 296 overall
Relevant to this application:
Householder decisions

Cheshire East is one of the slowest councils in England for householder decisions: #268 of 296 on speed. The council extends the time limit on 65% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cheshire East decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #168 of 296
91%
Householder approved
Above avg (90%) #170 of 296
39%
Decided in 8 weeks
Below avg (63%) #268 of 296
65%
Extended time limit
Above avg (41%) #279 of 296
72%
Minor dwellings approved
358 decided (1-9 homes)
76%
Major dwellings approved
25 decided (10+ homes)
79%
Change of use approved
119 decided
2,513
Total decisions
321 refused in the year to March 2026