68 Campbell Road, London, E3 4EA Data via plota.co.uk

PA/26/01925/A1 - Full Planning Permission Registered

Proposal

Partial demolition, refurbishment and extension of the former Cherry Trees School for use as specialist adult day provision and community hub, including change of use from Use Class F1 to E(f). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 9 Nov 2026
Decision
Expected by 4 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 4 Jan 2027 and 11 Jan 2027, from Tower Hamlets's recent changes of use.

Documents 33

Plans & drawings 22

PDF 00203-FLE-ZZ-ZZ-DR-A-200000 EXISTING ELEVATIONS Current Plan · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-00-DR-A-100100 PROPOSED GROUND FLOOR PLAN Current Plan · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-ZZ-DR-A-900100 VISUALISATION Current Plan · 10 Nov 2026 View ↗ PDF 251230-TMA-XX-DR-AP-2400-P00 PROPOSED LAYOUT AND TREE WORKS Current Plan · 10 Nov 2026 View ↗ PDF 24-432-QED-XX-XX-DR-C-0200-P01 PROPOSED LEVELS Current Plan · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-ZZ-DR-A-000001 LOCATION PLAN Current Plan · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-01-DR-A-100001 EXISTING FIRST FLOOR PLAN Current Plan · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-00-DR-A-100500 DEMOLITION GROUND FLOOR PLAN Current Plan · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-02-DR-A-100102 PROPOSED ROOF PLAN Current Plan · 10 Nov 2026 View ↗ PDF 251230-TMA-XX-DR-AP-2501-P00 TREE PROTECTION FOR CONSTRUCTION Current Plan · 10 Nov 2026 View ↗ PDF INTERIM TRAVEL PLAN Report · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-ZZ-DR-A-200100 PROPOSED ELEVATIONS Current Plan · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-02-DR-A-100002 EXISTING ROOF PLAN Current Plan · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-01-DR-A-100501 DEMOLITION FIRST FLOOR PLAN Current Plan · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-ZZ-DR-A-300100 PROPOSED SECTIONS Current Plan · 10 Nov 2026 View ↗ PDF 251230-TMA-XX-DR-AP-2300-P00 EXISTING LAYOUT AND TREE WORKS Current Plan · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-ZZ-DR-A-000002 SITE PLAN Current Plan · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-01-DR-A-100000 EXISTING GROUND FLOOR PLAN Current Plan · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-ZZ-DR-A-300001 EXISTING SECTION Current Plan · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-01-DR-A-100101 PROPOSED FIRST FLOOR PLAN Current Plan · 10 Nov 2026 View ↗ PDF 251230-TMA-XX-DR-AP-2500-P00 TREE PROTECTION FOR DEMOLITION Current Plan · 10 Nov 2026 View ↗ PDF 00203-FLE-ZZ-ZZ-DR-A-200100 PROPOSED ELEVATIONS Current Plan · 10 Nov 2026 View ↗

All documents on the council site ↗

Site constraints 8

Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 12 m away: Thames Tideway Tunnel
The site is 12 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Local nature reserve 333 m away: Tower Hamlets Cemetery Park; 3 listed buildings within 150 m; Conservation area 41 m away: Tomlins Grove; Inside the Tower Hamlets built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
E3 4EA
Received
around 9 Nov 2026
Validated
9 Nov 2026
Ward
Bromley North
Case officer
Show
Target decision
4 Jan 2027
Decision level
Delegated
Applicant
Show
Agent
Fleet Architects

Decision outlook

Day 9 of the 56-day target. Tower Hamlets usually decides changes of use by day 56.

Day 947 days to the 56-day target
53%decided within 8 weeks
59%approved
71decided in the last year

Plota live figures for changes of use decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Statutory expiry
4 Jan 2027
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Change of use

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026