2025/1873/NMA - Non Material Amendment Being Considered

Proposal

Conversion, extension and change of use of building from retail with associated workshops/storage (Class A1) to Restaurant and Bar (Class A3) and Offices (class B1) to ground floor and 11 residential units to upper floors with associated external alterations and works - Non Material Amendment to Planning Permission granted 25th May 2021 to allow an amendment to condition 2 (Approved Plans) to allow for minor fenestration alterations, works on roof and addition of solar panels. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Sept 2025
✓
Consultation
3 Sept 2025
Decision
Target date was 30 Sept 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 11 Nov 2026; it is now day 435.

The consultation period closed on 24 Sept 2025.

Associated applications 6

Site constraints 5

Grade II listed: 13 Cambrian Place
List entry 11567 · 21 m away · 14 more listed buildings within 150 m (1 Grade II*, 13 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 14 with distances
Cadw ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Maritime Quarter conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National infrastructure project 924 m away: Tidal Lagoon Swansea Bay
The site is 924 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Coalfield, development low risk area.
Not affected
No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area484 m² (5,210 sq ft)
Energy ratingC (asset rating 71)
UseA1/A2 Retail and Financial/Professional services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in August 2017, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Swansea - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Swansea
Application type
Non Material Amendment
Postcode
SA1 1PQ
Received
2 Sept 2025
Validated
2 Sept 2025
Ward
Waterfront - Bay Area
Case officer
Show
Target decision
30 Sept 2025
Applicant
Show
Agent
Asbri Planning Ltd.

Decision outlook

Day 435, past the statutory target. 84% of amendments in Swansea are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 8 Nov 2026.

Day 435379 days past the 56-day target
72%decided within 8 weeks
86%approved
130decided in the last year

Plota live figures for amendments decided by Swansea in the last twelve months, from validation. Swansea decision record →

Public comments

No public comments yet.

Last counted 8 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14204827
Planning Portal ref
PP-14204827
Consultation
3 Sept 2025
Comments by
24 Sept 2025
Statutory expiry
30 Sept 2025
Env. assessment
No