Unit 3, Frontier Way, Burnley, BB11 5FE Data via plota.co.uk

PA/2026/0422 - Full planning permission Under Consultation

Proposal

Erection of new production tower to house material silo(s) for the manufacture of cementitious based products including a new weighbridge within the site. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Sept 2026
✓
Validated
23 Sept 2026
Decision
Target date was 18 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 61.

The consultation period closed on 26 Oct 2026.

Documents 25

All documents on the council site ↗

Site constraints 7

Public footpath about 1 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 5. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area; Priority habitat about 1 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 13 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Burnley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Burnley
Application type
Full planning permission
Postcode
BB11 5FE
Received
22 Sept 2026
Validated
23 Sept 2026
Ward
Hapton with Park
Parish
Hapton
Case officer
Show
Target decision
18 Nov 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 61, past the statutory target. 92% of commercial premises in Burnley are decided within thirteen weeks, which runs to 23 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 615 days past the 56-day target
71%decided within 8 weeks
86%approved
9%go to committee

Plota live figures for commercial premises decided by Burnley in the last twelve months, from validation. Burnley decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
26 Oct 2026
Burnley
Planning Authority Score
5/10
Average
#145 of 296 overall
Relevant to this application:
Householder decisions

Burnley is #113 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Burnley decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #148 of 296
90%
Householder approved
Above avg (90%) #187 of 296
71%
Decided in 8 weeks
Above avg (63%) #113 of 296
40%
Extended time limit
Below avg (41%) #149 of 296
73%
Minor dwellings approved
30 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
82%
Change of use approved
22 decided
294
Total decisions
36 refused in the year to March 2026