28 High Street Huntingdon PE29 3TH Data via plota.co.uk

26/01435/LBC - Listed Building Consent In progress

Proposal

Proposed reinstatement of seperating internal wall at second floor Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Aug 2026
✓
Validated
10 Aug 2026
✓
Consultation
13 Aug 2026
Decision
Expected by 5 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Oct 2026, from Huntingdonshire's recent extensions.

The consultation period closed on 16 Sept 2026.

Site constraints 10

Grade II* listed: 28, High Street
List entry 1161677 · The pin is inside its outline · 26 more listed buildings within 150 m (1 Grade I, 2 Grade II*, 22 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 26 with distances
Historic England ↗
Huntingdon conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
National infrastructure project 161 m away: A14 Cambridge to Huntingdon Improvement Scheme
The site is 161 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Scheduled monument 136 m away: Huntingdon Castle (Castle Hills): a motte and bailey castle and Civil War fieldwork
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Special area of conservation 336 m away: Portholme; Radon affected area, class 3; SSSI 337 m away: Portholme SSSI; Heritage at risk 68 m away: Church of St Mary, High Street; Inside the Huntingdon built-up area; Air quality management area 49 m away: Huntingdon AQMA.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area497 m² (5,350 sq ft)
Energy ratingC (asset rating 57)
UseOffices and Workshop Businesses
HeatingAir Conditioning

From the energy performance certificate lodged in July 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Huntingdonshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
PE29 3TH
Received
6 Aug 2026
Validated
10 Aug 2026
Ward
Huntingdon North
Parish
Huntingdon
Case officer
Show
Target decision
5 Oct 2026
Applicant
Show
Agent
T F Designs
Leaseholder
Show

Decision outlook

Day 60, past the statutory target. 82% of extensions in Huntingdonshire are decided within thirteen weeks, which runs to 9 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 604 days past the 56-day target
51%decided within 8 weeks
91%approved
449decided in the last year

Plota live figures for extensions decided by Huntingdonshire in the last twelve months, from validation. Huntingdonshire decision record →

Public comments

No public comments yet.

20 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15114184
Planning Portal ref
PP-15114184
Neighbours
13 Aug 2026
Consultation
13 Aug 2026
Comments by
16 Sept 2026
Site or press notice
25 Aug 2026
Statutory expiry
5 Oct 2026
Env. assessment
No
Huntingdonshire
Planning Authority Score
3.9/10
Below average
#197 of 296 councils
Relevant to this application:
Other decisions

Huntingdonshire is slower than most councils at deciding householder applications, ranking #210 out of 296. 55% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Huntingdonshire decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #155 of 296
95%
Householder approved
Above avg (90%) #80 of 296
55%
Decided in 8 weeks
Below avg (63%) #210 of 296
55%
Extended time limit
Above avg (41%) #250 of 296
69%
Minor dwellings approved
175 decided (1-9 homes)
91%
Major dwellings approved
22 decided (10+ homes)
87%
Change of use approved
52 decided
1,077
Total decisions
125 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.