6 Normandy Street, Alton, Hampshire, GU34 1DD Data via plota.co.uk

EHDC-25-0867-LBC - Listed Building Consent Refused

Proposal

Listed Building Consent for the conversion of two Grade II listed shops (Use Class E) to 2 1-bed, 1-person C3 dwellinghouses. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Jul 2025
✗
Refused
20 Oct 2025
Appeal
Appeal In Progress

Refused on 20 Oct 2025 · Delegated · Last checked 18 Oct 2026

Site constraints 5

Grade II listed: 4 and 6, Normandy Street
List entry 1094136 · The pin is inside its outline · 26 more listed buildings within 150 m (1 Grade I, 25 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 26 with distances
Historic England ↗
Alton conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
National infrastructure project 1.8 km away: Southampton to London Pipeline Project; Inside the Alton (East Hampshire) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Hampshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
GU34 1DD
Received
18 Jul 2025
Validated
18 Jul 2025
Ward
Alton Eastbrooke
Parish
Alton CP
Case officer
Show
Target decision
22 Oct 2025
Decision
REFUSAL
Decision date
20 Oct 2025
Decision level
Delegated
Applicant
Show
Agent
Town Planning Expert

How this decision compares

Decided in 94 days from validation, 5 days slower than East Hampshire's median of 89 for listed building works. Refused, as 8% of listed building works here are.

18%decided within 8 weeks
92%approved
43decided in the last year

Plota live figures for listed building works decided by East Hampshire in the last twelve months, from validation. East Hampshire decision record →

Consultation & key dates

Comments by
9 Sept 2025
Statutory expiry
22 Oct 2025
East Hampshire
Planning Authority Score
1.5/10
Poor
#282 of 296 overall
Relevant to this application:
Other decisions

East Hampshire is one of the slowest councils in England for householder decisions: #293 of 296 on speed. The council extends the time limit on 72% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Hampshire decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #153 of 296
91%
Householder approved
Above avg (90%) #173 of 296
24%
Decided in 8 weeks
Below avg (63%) #293 of 296
72%
Extended time limit
Above avg (41%) #288 of 296
63%
Minor dwellings approved
72 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
88%
Change of use approved
24 decided
606
Total decisions
72 refused in the year to March 2026