ALTON HOUSE HOTEL Normandy Street, Alton, Hampshire, GU34 1DW Data via plota.co.uk

EHDC-26-1111-TPO - Tree Preservation Order Pending Consideration

Proposal

G2 - Lime and Sycamore - to fell to ground. Poor specimens Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Oct 2026
Decision
Expected by 26 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 24 Nov 2026 and 10 Dec 2026, from East Hampshire's recent tree and landscaping works.

The consultation period closed on 22 Oct 2026.

Site constraints 6

Grade II listed: Alton House Hotel
List entry 1094141 · The pin is inside its outline · 6 more listed buildings within 150 m (6 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 6 with distances
Historic England ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
National infrastructure project 1.7 km away: Southampton to London Pipeline Project; Conservation area 65 m away: Alton; Tree preservation order 20 m away: Alton House Hotel, Normandy Street, Alton; Inside the Alton (East Hampshire) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Hampshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Preservation Order
Postcode
GU34 1DW
Received
1 Oct 2026
Validated
1 Oct 2026
Ward
Alton Eastbrooke
Parish
Alton CP
Case officer
Show
Target decision
26 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
ArbAware Tree Care Ltd
Freehold owner
Show

Decision outlook

Day 53 of the 56-day target. East Hampshire usually decides tree and landscaping works by day 60.

Day 537 days to the predicted decision (day 60)
44%decided within 8 weeks
95%approved
323decided in the last year

Plota live figures for tree and landscaping works decided by East Hampshire in the last twelve months, from validation. East Hampshire decision record →

Consultation & key dates

Comments by
22 Oct 2026
Statutory expiry
26 Nov 2026
East Hampshire
Planning Authority Score
1.5/10
Poor
#282 of 296 overall
Relevant to this application:
Householder decisions

East Hampshire is one of the slowest councils in England for householder decisions: #293 of 296 on speed. The council extends the time limit on 72% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Hampshire decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #153 of 296
91%
Householder approved
Above avg (90%) #173 of 296
24%
Decided in 8 weeks
Below avg (63%) #293 of 296
72%
Extended time limit
Above avg (41%) #288 of 296
63%
Minor dwellings approved
72 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
88%
Change of use approved
24 decided
606
Total decisions
72 refused in the year to March 2026