Nursing Home Whitgift House 76 Brighton Road South Croydon CR2 6AB Data via plota.co.uk

25/03176/TRE - Consent for works to protected trees Approved

Proposal

T 6,7,8,9 Limes - Crown Lift to 3m measured from ground level T11 Lime - crown lift to 5m measured from ground level. T66 Catalpa cut back to clear buildings by 2 metres and crown lift by 3 metres measured from ground level to clear seating. T23 Cherry crown lift to 3 metres to clear foot path and reduce lateral branches opposite path on field side to balance and apply cobra brace to support limb. (TPO 09, 1970) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Sept 2025
✓
Approved
28 Oct 2025

Approved on 28 Oct 2025 · Delegated Business Meeting · Last checked 12 Oct 2026

Site constraints 6

Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Croydon AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
1 listed building within 150 m
Nearest: Haling Cottage (Whitgift School Headmaster's House), Grade II, 34 m away
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Also on the record
Radon affected area, class 3; Inside the Croydon built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Croydon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Croydon
Application type
Consent for works to protected trees
Postcode
CR2 6AB
Received
29 Sept 2025
Validated
29 Sept 2025
Ward
Waddon
Case officer
Show
Target decision
24 Nov 2025
Decision
Consent Granted (Tree App.)
Decision date
28 Oct 2025
Decision level
Delegated Business Meeting
Applicant
Show

How this decision compares

Decided in 29 days from validation, about the council's usual 29 days. Approved, as 91% of tree and landscaping works here are.

98%decided within 8 weeks
91%approved
339decided in the last year

Plota live figures for tree and landscaping works decided by Croydon in the last twelve months, from validation. Croydon decision record →

Public comments

No public comments yet.

Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14357662
Planning Portal ref
PP-14357662
Statutory expiry
24 Nov 2025
Croydon
Planning Authority Score
3.6/10
Below average
#215 of 296 councils
Relevant to this application:
Householder decisions

Croydon ranks #159 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Croydon decision statistics
Based on MHCLG data, the year to March 2026
75%
Overall approval rate
Below avg (87%) #286 of 296
87%
Householder approved
Below avg (90%) #230 of 296
62%
Decided in 8 weeks
Below avg (63%) #159 of 296
44%
Extended time limit
Above avg (41%) #177 of 296
45%
Minor dwellings approved
238 decided (1-9 homes)
58%
Major dwellings approved
12 decided (10+ homes)
53%
Change of use approved
53 decided
1,590
Total decisions
403 refused in the year to March 2026