Clarendon Apartments Canal Walk Southampton SO14 3BT Data via plota.co.uk

25/01452/FUL - Full Application Awaiting decision

Proposal

Implementation of planning permission not in accordance with condition 11 (Green roof implementation) and 15 (Roof terrace Management) for erection of two additional floors, along with a five-storey rear extension to provide an additional 24 flats (comprising 24 x one bed flats) with associated elevational changes and provision of cycle and refuse storage facilities Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 28 Nov 2025
✓
Consultation
4 Dec 2025
Decision
Expected by 27 Mar 2027

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 360.

The consultation period closed on 25 Dec 2025.

Associated applications 4

Site constraints 10

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Scheduled monument 110 m away: Holy Rood Church
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Conservation area 50 m away: Old Town North; 7 listed buildings within 150 m; Heritage at risk 50 m away: Old Town North; Special protection area 475 m away: Solent and Dorset Coast; Inside the Southampton built-up area; National infrastructure project 1.1 km away: Solent Gateway 2, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southampton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
SO14 3BT
Received
around 28 Nov 2025
Validated
28 Nov 2025
Ward
Bargate
Case officer
Show
Target decision
27 Mar 2027
Applicant
Show
Agent
RS Studio
Leaseholder
Show

Decision outlook

Day 360, past the statutory target. 89% of full applications in Southampton are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 21 Nov 2026.

Day 360269 days past the 91-day target
66%decided within 8 weeks
91%approved
6%go to committee

Plota live figures for full applications decided by Southampton in the last twelve months, from validation. Southampton decision record →

Public comments

1comment received
1 neutral

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
8400
Neighbours
4 Dec 2025
Consultation
4 Dec 2025
Comments by
25 Dec 2025
Statutory expiry
27 Feb 2026
Env. assessment
No
Southampton
Planning Authority Score
5/10
Average
#150 of 296 overall
Relevant to this application:
Householder decisions

Southampton is #158 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southampton decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #117 of 296
93%
Householder approved
Above avg (90%) #137 of 296
63%
Decided in 8 weeks
Above avg (63%) #158 of 296
40%
Extended time limit
Below avg (41%) #154 of 296
70%
Minor dwellings approved
50 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
86%
Change of use approved
109 decided
742
Total decisions
72 refused in the year to March 2026

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.