79 - 82 Canal Walk Southampton SO14 3BH Data via plota.co.uk
Proposal
First floor extension and change of use of ground floor commercial unit to create short term serviced apartments (5 x studios) with internal link to existing accommodation at 79-80 Canal Walk. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 112.
Documents 6
Statements & assessments 1
Application forms 3
Site constraints 9
Show all 4 with distances
- 30 mSection of Wall Running North From A Point Opposite the Entrance to East Gate Street to Rear of No 107 East StreetGrade II
- 43 m60, Back of the WallsGrade II
- 110 mSection of Wall Running West From Polymond Tower to Remains of Semi-Circular Tower to East of Bargate and Small Part South of Polymond TowerGrade I
- 112 mStar HotelGrade II*
Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Building
From the energy performance certificate lodged in September 2023, the latest held for this property. The building may have changed since. View the certificate
Every application in Southampton - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Nearby new applications
Clarendon Apartments Canal Walk Southampton
Implementation of planning permission 22/01042/FUL not in accordance with condit...
Unit Msu03 and Rotunda Entrance Lower Ground Level West Quay Shopping Centre Southampton SO15 1QE
Reconfiguration of unit frontage including removal of existing canopy and conser...
Austen House Back of The Walls Southampton
Application for approval of details reserved by condition 3(Nitrates) of permiss...
Unit B01 1 - 2 Bargate Walk Southampton
Installation of internally illuminated fascia signs
12 - 14 Above Bar Street Southampton SO14 7DQ
Installation of 1x internally illuminated facia sign and 1x internally illuminat...
Unit 2 69A Above Bar Street Southampton SO14 7FE
Retention of 2 x metal roller shutters to the shop front (Retrospective)
Important details
- Council
- Southampton
- Application type
- Full Application
- Postcode
- SO14 3BH
- Received
- 3 Aug 2026
- Validated
- 3 Aug 2026
- Ward
- Bargate
- Case officer
- Show
- Target decision
- 6 Nov 2026
- Applicant
- Show
Decision outlook
Day 112, past the statutory target. 78% of changes of use in Southampton are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.
Plota live figures for changes of use decided by Southampton in the last twelve months, from validation. Southampton decision record →
Public comments
No public comments yet.
55 neighbours consulted · Last counted 22 Nov 2026
Consultation & key dates
- Alt. reference
- 2364
- Neighbours
- 7 Aug 2026
- Consultation
- 7 Aug 2026
- Comments by
- 28 Aug 2026
- Statutory expiry
- 28 Sept 2026
- Env. assessment
- No
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Nearby activity
Southampton is #158 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).
Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.
Track this application
79 - 82 Canal Walk Southampton SO14 3BH
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

The consultation period closed on 28 Aug 2026.