Market Hall Trinity House Lane Kingston Upon Hull HU1 2JH Data via plota.co.uk

26/00630/LBC - Listed Building Consent - alteration Pending Consideration

Proposal

Listed Building Consent for:- installation of intake/extract ductwork and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Jun 2026
✓
Validated
22 Jul 2026
Decision
Expected by 16 Sept 2026

As of 15 Aug 2026, the council is no longer showing this application on their planning portal. It may have been withdrawn or re-listed under a different reference. We've stopped checking it for updates.

Site constraints 9

Grade I listed: Hull Trinity House
List entry 1219563 · The pin is inside its outline · 90 more listed buildings within 150 m (2 Grade I, 4 Grade II*, 84 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 90 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Old Town conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Air quality management area: Hull AQMA No.1(A)
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 24 m away: A63 Castle Street Improvement-Hull
The site is 24 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Special area of conservation 339 m away: Humber Estuary; SSSI 339 m away: Humber Estuary - 2000480 SSSI; Scheduled monument 234 m away: Beverley Gate and adjacent archaeological remains forming part of Hull's medieval and post-medieval defences; Inside the Kingston upon Hull built-up area.
Not affected
Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
Listed Building Consent - alteration
Postcode
HU1 2JH
Received
25 Jun 2026
Validated
22 Jul 2026
Ward
St Andrews And Dockland
Case officer
Show
Agent
Hull City Council
Freehold owner
Show

Decision outlook

Day 79 of the 56-day target. Hull usually decides listed building consent by day 91.

Day 7912 days to the predicted decision (day 91)
25%decided within 8 weeks
100%approved
6%go to committee

Plota live figures for listed building consent decided by Hull in the last twelve months, from validation. Hull decision record →

Public comments

No public comments yet.

Last counted 8 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
EM
Comments by
20 Aug 2026
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 councils
Relevant to this application:
Other decisions

Hull is slower than most councils at deciding householder applications, ranking #231 out of 296. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.