Land At Pool Lane, Winterley, Cheshire East, CW11 4TT Data via plota.co.uk

Pending 26/2527/TPO - Works to TPO Trees
Date received
14 Jul 2026
Postcode
CW11 4TT
Type
Works to TPO Trees

Description

Tree work to Oak tree (T1) to crown lift to 3m above ground level around the canopy extent adjoining the boundary, remove dead, damaged and diseased wood greater than 25mm to the boundary line only, Sycamore tree (T4) to crown lift to 3m over the grass verge and remove deadwood greater than 25mm throughout the canopy, two Oak trees (G4) to tidy fraction and torn branch stubs back to suitable growth points on the main stem where appropriate, remove dead, damaged & diseased wood greater than 25mm in diameter within the falling distance of the adjacent plot and remove dead, damaged, and diseased wood greater than 50mm in diameter throughout the remainder of the canopy, Ash tree only (G5) to sever ivy to allow it to die and fall off naturally, cut back the main branch growing towards the adjacent property to the main trunk, remove dead, damaged, and diseased wood greater than 25mm in diameter throughout the canopy and Oak tree (T3) remove dead, damaged and diseased wood greater than 25mm in diameter throughout the canopy and tidy stubs on trunk… Data via plota.co.uk

Work with planning data? Every application in Cheshire East - and every UK council - as a live feed or API. About Plota's data service

Cheshire East
Planning Authority Score
1.9/10
Poor
#274 of 296 councils
Relevant to this application:
Householder decisions

Cheshire East is one of the slowest councils in England for householder decisions, ranking #268 out of 296. The council extends the time limit on 65% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cheshire East decision performance
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #168 of 296
91%
Householder approved
Above avg (90%) #170 of 296
39%
Decided in 8 weeks
Below avg (63%) #268 of 296
65%
Extended time limit
Above avg (41%) #279 of 296
72%
Minor dwellings approved
358 decided (1-9 homes)
76%
Major dwellings approved
25 decided (10+ homes)
79%
Change of use approved
119 decided
2,513
Total decisions
321 refused in the year to March 2026