The Ropeyards, Royal Arsenal Riverside, Blocks D and K3, K4 and K5, Land between Duke of Wellington Avenue… Data via plota.co.uk

25/3564/SD - Submission of Details 8 Weeks Approved

Proposal

Submission of details pursuant to Plots D and K discharge Condition 31 (Pre-Impact Piling) of planning permission Ref dated 17/03/2017. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Oct 2025
✓
Consultation
20 Nov 2025
✓
Approved
29 Jun 2026

Approved on 29 Jun 2026 · Delegation · Last checked 8 Nov 2026

Documents 53

Plans & drawings 26

PDF Z429-wat17-zz-zz-dr-s-330-101 Proximity of foundation piling to tw assets plan sheet 1 Drawing · 14 Jan 2026 View ↗ PDF Z429-wat17-zz-zz-dr-s-330-102 Proximity of foundation piling to tw assets section sheet 2 Drawing · 14 Jan 2026 View ↗ PDF Linear park all drawings Drawing · 27 Oct 2025 View ↗ PDF Linear park site details and document Drawing · 27 Oct 2025 View ↗ PDF Block d sheet piling elevations sheet 5 Drawing · 27 Oct 2025 View ↗ PDF Block d sheet site elevation site 4 Drawing · 27 Oct 2025 View ↗ PDF Block d sheet piling details Drawing · 27 Oct 2025 View ↗ PDF Block d piling layout zone 1 Drawing · 27 Oct 2025 View ↗ PDF Blocks k3 to k5 piling layout Drawing · 27 Oct 2025 View ↗ PDF Blocks k3 to k5 pile schedule Drawing · 27 Oct 2025 View ↗ PDF Block d sheet piling Drawing · 27 Oct 2025 View ↗ PDF Block d sheet piling elevations sheet 3 Document · 27 Oct 2025 View ↗ PDF Block d sheet piling elevations sheet 2 Drawing · 27 Oct 2025 View ↗ PDF Sheet piling uk tracked plant brochure Drawing · 27 Oct 2025 View ↗ PDF Block d piling layout zone 2 Drawing · 27 Oct 2025 View ↗ PDF Block d Drawing · 27 Oct 2025 View ↗ PDF Block d sheet piling Drawing · 27 Oct 2025 View ↗ PDF Permanent piling sheet Drawing · 27 Oct 2025 View ↗ PDF Block d piling layout zone 4 Drawing · 27 Oct 2025 View ↗ PDF Phases 18 19 site detail Drawing · 27 Oct 2025 View ↗ PDF Site plan and documents Drawing · 27 Oct 2025 View ↗ PDF Propping arrangement and details Drawing · 27 Oct 2025 View ↗ PDF Integrated management systemworks package plan Document · 27 Oct 2025 View ↗ PDF Rar blocks d and k part 3 Drawing · 27 Oct 2025 View ↗ PDF Service penetration details Drawing · 27 Oct 2025 View ↗ PDF Land at maribor park, new warren lane, london, se18 6nf Drawing · 27 Oct 2025 View ↗

All documents on the council site ↗

Site constraints 11

Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 30 m away: Thames Tideway Tunnel
The site is 30 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 163 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Town centre: Woolwich
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Heritage at risk 17 m away: Woolwich Town Centre; Radon affected area, class 2; 5 listed buildings within 150 m; Conservation area 75 m away: Royal Arsenal Woolwich; Inside the Greenwich built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Submission of Details 8 Weeks
Postcode
SE18 6NP
Received
24 Oct 2025
Validated
24 Oct 2025
Ward
WOOLWICH ARSENAL
Parish
Woolwich & Thamesmead
Case officer
Show
Target decision
2 Jul 2026
Decision
Approve
Decision date
29 Jun 2026
Decision level
Delegation
Applicant
Show

Public comments

No public comments yet.

Last counted 8 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14323909
Planning Portal ref
PP-14323909
Consultation
20 Nov 2025
Comments by
11 Dec 2025
Statutory expiry
19 Dec 2025
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 overall
Relevant to this application:
Householder decisions

Greenwich is faster than most councils at deciding householder applications: #76 of 296 on speed. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026