Woolwich Town Hall, Wellington Street, SE18 6HQ Data via plota.co.uk

26/2777/CLPL - Certificate of Lawfulness for Listed Bdg Awaiting decision

Proposal

Installation of an air conditioning unit to room 7 with associated 'reversable' works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Sept 2026
✓
Validated
9 Nov 2026
✓
Consultation
9 Nov 2026
Decision
Expected by 21 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 4 Jan 2027 and 18 Jan 2027, from Greenwich's recent utility and infrastructure works.

Comments are open until 30 Nov 2026

Comment on this application ↗

Site constraints 9

Grade II* listed: Woolwich Town Hall
List entry 1289668 · 21 m away · 5 more listed buildings within 150 m (5 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 5 with distances
Historic England ↗
Heritage at risk: Woolwich Town Centre
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Woolwich
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project 368 m away: Thames Tideway Tunnel
The site is 368 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 424 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Greenwich built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 10 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Certificate of Lawfulness for Listed Bdg
Postcode
SE18 6HQ
Received
22 Sept 2026
Validated
9 Nov 2026
Ward
WOOLWICH ARSENAL
Parish
Woolwich & Thamesmead
Case officer
Show
Target decision
21 Dec 2026
Applicant
Show
Agent
Royal Greenwich

Decision outlook

Day 14 of the 56-day target. Greenwich usually decides utility and infrastructure works by day 60.

Day 1446 days to the predicted decision (day 60)
43%decided within 8 weeks
90%approved
43decided in the last year

Plota live figures for utility and infrastructure works decided by Greenwich in the last twelve months, from validation. Greenwich decision record →

Public comments

No public comments yet.

Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
9 Nov 2026
Comments by
30 Nov 2026
Statutory expiry
21 Dec 2026
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 overall
Relevant to this application:
Other decisions

Greenwich is faster than most councils at deciding householder applications: #76 of 296 on speed. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use