An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent () dated 26/11/2025 to allow: Entrance design changes, Facade material amendments, Internal layout changes and Alterations to the Art wall/substation building, tree species and gutter details. Amendments to conditions 2 (approved plans) and 34 (green / brown roofs) noting the amendments brought forwards by this application. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Dec 2025
✓
Validated
3 Dec 2025
✓
Consultation
4 Dec 2025
✓
Approved
13 Jan 2026

Approved on 13 Jan 2026 · Delegation · Last checked 7 Oct 2026

Documents 25

All documents on the council site ↗

Associated applications 14

Site constraints 13

World heritage site: Maritime Greenwich
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Blackheath conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 73 m away: Thames Tideway Tunnel
The site is 73 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, 1638 m); London Strategic Heat Main Project (at pre-application, 52 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Town centre: Greenwich West
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Scheduled monument 79 m away: Greenwich Palace
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
19 listed buildings within 150 m
Nearest: Devonport House, Grade II, 37 m away · 19 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 19 with distances
Historic England ↗
Also on the record
Radon affected area, class 2; Inside the Greenwich built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square; Metropolitan Open Land 79 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area810 m² (8,719 sq ft)
Energy ratingD (asset rating 84)
UseResidential spaces
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in March 2020, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Non Material
Postcode
SE10 9JW
Received
2 Dec 2025
Validated
3 Dec 2025
Ward
GREENWICH PARK
Case officer
Show
Target decision
16 Jan 2026
Decision
Approve
Decision date
13 Jan 2026
Decision level
Delegation
Agent
Turley

How this decision compares

Decided in 41 days from validation, 4 days faster than Greenwich's median of 45 for amendments. Approved, as 81% of amendments here are.

73%decided within 8 weeks
81%approved
110decided in the last year

Plota live figures for amendments decided by Greenwich in the last twelve months, from validation. Greenwich decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14531005
Planning Portal ref
PP-14531005
Consultation
4 Dec 2025
Statutory expiry
31 Dec 2025
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 councils
Relevant to this application:
Householder decisions

Greenwich is faster than most councils at deciding householder applications, ranking #76 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026