33-36 King William Walk, Greenwich, London, SE10 9HU Data via plota.co.uk

26/2343/F - Full Planning Permission Approved

Proposal

Works to existing parapet wall for the addition of lead capping. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Aug 2026
✓
Validated
24 Aug 2026
✓
Consultation
26 Aug 2026
✓
Approved
19 Oct 2026

Approved on 19 Oct 2026 · Delegation · Last checked 20 Oct 2026

Site constraints 15

Grade II listed: 33-36, King William Walk Se10
List entry 1290582 · 3 m away · 34 more listed buildings within 150 m (2 Grade I, 32 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 34 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
World heritage site: Maritime Greenwich
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Blackheath conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, 1643 m); London Strategic Heat Main Project (at pre-application, 48 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Scheduled monument 23 m away: Greenwich Palace
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Greenwich West
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Radon affected area, class 2; Inside the Greenwich built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Metropolitan Open Land 23 m away.
Not affected
Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area118 m² (1,270 sq ft)
Energy ratingF (30 out of 100), could reach B
PropertyMid-terrace house, 6 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in March 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Full Planning Permission
Postcode
SE10 9HU
Received
6 Aug 2026
Validated
24 Aug 2026
Ward
GREENWICH PARK
Parish
Greenwich
Case officer
Show
Target decision
19 Oct 2026
Decision
Approve
Decision date
19 Oct 2026
Decision level
Delegation
Applicant
Show
Agent
Simmons Architects Ltd

How this decision compares

Decided in 56 days from validation, about the council's usual 56 days. Approved, as 77% of extensions here are.

79%decided within 8 weeks
77%approved
965decided in the last year

Plota live figures for extensions decided by Greenwich in the last twelve months, from validation. Greenwich decision record →

Public comments

No public comments yet.

Last counted 20 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15138812
Planning Portal ref
PP-15138812
Consultation
26 Aug 2026
Comments by
23 Sept 2026
Statutory expiry
19 Oct 2026
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 councils
Relevant to this application:
Householder decisions

Greenwich is faster than most councils at deciding householder applications, ranking #76 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026