5 Wadebridge Road St Mabyn Bodmin Cornwall PL30 3BH Data via plota.co.uk

PA26/05708 - Tree Preservation Order Refused

Proposal

Works to trees subject to a Tree Preservation Order (TPO): T1 (Beech tree) - to crown reduce the tree from 15m to 12m. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Aug 2026
✗
Refused
12 Oct 2026
Appeal
Not lodged

Refused on 12 Oct 2026 · HoS Sign Off · Last checked 12 Oct 2026

Site constraints 8

Nutrient neutrality catchment: River Camel SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
5 listed buildings within 150 m
Nearest: Sunnyside, Grade II, 45 m away · 5 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 5 with distances
Historic England ↗
Also on the record
Scheduled monument 233 m away: Medieval wayside cross in St Mabyn churchyard; Inside the St Mabyn built-up area; Priority habitat 21 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £405,000 in January 2023. Semi-detached house, freehold.

13 January 2023£405,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area100 m² (1,076 sq ft)
Energy ratingE (45 out of 100), could reach D
PropertySemi-detached house, 4 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, LPG
WallsCavity wall, filled cavity

From the energy performance certificate lodged in July 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Tree Preservation Order
Postcode
PL30 3BH
Received
17 Aug 2026
Validated
17 Aug 2026
Ward
Wadebridge West And St Mabyn
Parish
St. Mabyn
Case officer
Show
Target decision
12 Oct 2026
Decision
Refusal one reason
Decision date
12 Oct 2026
Decision level
HoS Sign Off
Applicant
Show
Agent
Hewitt Tree Surgery

How this decision compares

Decided in 56 days from validation, 18 days slower than Cornwall's median of 38 for tree and landscaping works. Refused, as 11% of tree and landscaping works here are.

94%decided within 8 weeks
89%approved
1,158decided in the last year

Plota live figures for tree and landscaping works decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Public comments

No public comments yet.

Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15161790
Planning Portal ref
PP-15161790
Statutory expiry
12 Oct 2026
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 overall
Relevant to this application:
Householder decisions

Cornwall is faster than most councils at deciding householder applications: #64 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.