Frogmore Industrial Estate Acton Lane Park Royal NW10 7NQ Data via plota.co.uk

254076OPDCOB - OPDC Consultation by Other Boroughs No Further Action

Proposal

Reserved Matters application with full details of appearance, layout, scale, the means of access and the landscaping of the development pursuant to outline planning permission dated 13 October 2022 for 'Outline planning application (all matters reserved) for demolition and redevelopment to provide a data centre (Use Class B8) of up to 35, 000sqm including ancillary offices, internal plant and equipment (including flues), and substation. In addition, up to 1, 000sqm of work units and café/coffee shop (Use Class E(a/b), E(g)(ii) & E(g)(iii), B2); car parking; provision of external plant and equipment (including flues); creation of servicing areas and provision of associated services, including waste, refuse, cycle storage, and lighting; and for the laying out of the buildings, routes and open spaces within the development; and all associated works and operations including but not limited to: demolition; earthworks; provision of attenuation infrastructure, engineering operations ( out of borough) Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
23 Oct 2025
✓
Validated
24 Oct 2025
Decision
Target date was 13 Nov 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 395.

Site constraints 5

Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for a data centre?

Plota Sites searches every land parcel in England and Wales: 3,798 sites fit this search. On and off the market, free to search.

Land for data centres
Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
OPDC Consultation by Other Boroughs
Postcode
NW10 7NQ
Received
23 Oct 2025
Validated
24 Oct 2025
Ward
North Acton
Case officer
Show
Target decision
13 Nov 2025
Applicant
Show

Decision outlook

Day 395, past the statutory target. 83% of other in Ealing are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 21 Nov 2026.

Day 395339 days past the 56-day target
65%decided within 8 weeks
95%approved
2,220decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in Ealing to go on. Ealing decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
13 Nov 2025
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026