Holderness Road Methodist Church Holderness Road Kingston Upon Hull Data via plota.co.uk

26/00847/PD - permitted development enquiry Pending Decision

Proposal

Replacing paving stones with tarmac or aggregate Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Aug 2026
Decision
Target date was 22 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 88.

Site constraints 5

2 listed buildings within 150 m
Nearest: Wilberforce Monument, Grade II, 10 m away · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 512 m away: A63 Castle Street Improvement-Hull
The site is 512 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Conservation area 0 m away: Holderness Rd (West)
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Inside the Kingston upon Hull built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
permitted development enquiry
Received
27 Aug 2026
Validated
27 Aug 2026
Ward
Drypool
Case officer
Show

Decision outlook

Day 88, past the statutory target. 86% of extensions in Hull are decided within thirteen weeks, which runs to 26 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 17 Nov 2026.

Day 8832 days past the 56-day target
64%decided within 8 weeks
89%approved
173decided in the last year

Plota live figures for extensions decided by Hull in the last twelve months, from validation. Hull decision record →

Public comments

No public comments yet.

Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
EM
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 overall
Relevant to this application:
Householder decisions

Hull is slower than most councils at deciding householder applications: #231 of 296 on speed. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026