Accommodation At 56 Witham Kingston Upon Hull HU9 1BE Data via plota.co.uk

25/00348/CONDET - Discharge of condtions Pending Consideration

Proposal

Discharge of conditions 4 and 5 for - 1. Change of Use of Upper Floors from hotel bedroom accommodation to 5 self contained flats; 2. Addition of flat roof to existing outbuilding following removal of existing pitched roof. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Apr 2025
Decision
Target date was 3 Jun 2025

Under consideration

No decision has been issued yet. The council's target date, 3 Jun 2025, has passed.

Associated applications 3

  • Part of

    Listed buildingApprovedcouncil archive

    Conditions 4, 5, 6 awaiting decision

Site constraints 5

Grade II listed: Wilberforce Monument
List entry 1283041 · The pin is inside its outline · 1 more listed building within 150 m (1 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other one with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Holderness Rd (West) conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
National infrastructure project 522 m away: A63 Castle Street Improvement-Hull
The site is 522 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Kingston upon Hull built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
Discharge of condtions
Postcode
HU9 1BE
Received
8 Apr 2025
Validated
8 Apr 2025
Ward
Drypool
Case officer
Show

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13929606
Planning Portal ref
PP-13929606
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 overall
Relevant to this application:
Change of use

Hull is slower than most councils at deciding householder applications: #231 of 296 on speed. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026