239 High Street Acton W3 9BY Data via plota.co.uk

263605FUL - Full Application Pending Consideration

Proposal

Change of use of upper floor office accommodation (Use Class E(g)(i) to residential use (Use Class C3) to provide two flats Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
29 Sept 2026
✓
Consultation
20 Nov 2026
Decision
Expected by 24 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision soon after comments close on 23 Dec 2026, from Ealing's recent changes of use.

Comments are open until 23 Dec 2026

Comment on this application ↗

Documents 35

Plans & drawings 28

PDF 27R SITE BLOCK PLAN PROPOSED Draw - Exist Site/Block Plan · 29 Sept 2026 View ↗ PDF LOCATION PLAN Draw - Location Plan · 29 Sept 2026 View ↗ PDF 01R EXISTING GROUND FLOOR Drawing · 29 Sept 2026 View ↗ PDF 08R 17R APPROVED PLANNING DRAWINGS Drawing · 29 Sept 2026 View ↗ PDF 18R PROPOSED GROUND FLOOR Drawing · 29 Sept 2026 View ↗ PDF 02R EXISTING FIRST FLOOR Drawing · 29 Sept 2026 View ↗ PDF 03R EXISTING ROOF PLAN Drawing · 29 Sept 2026 View ↗ PDF 04R EXISTING FRONT ELEVATION Drawing · 29 Sept 2026 View ↗ PDF 05R EXISTING REAR ELEVATION Drawing · 29 Sept 2026 View ↗ PDF 06R EXISTING RIGHT SIDE ELEVATION Drawing · 29 Sept 2026 View ↗ PDF 07R EXISTING LEFT SIDE ELEVATION Drawing · 29 Sept 2026 View ↗ PDF 19R PROPOSED FIRST FLOOR Drawing · 29 Sept 2026 View ↗ PDF 20R PROPOSED MANSARD FLOOR PLAN REV B Drawing · 29 Sept 2026 View ↗ PDF 21R PROPOSED ROOF PLAN Drawing · 29 Sept 2026 View ↗ PDF 22R PROPOSED FRONT ELEVATION Drawing · 29 Sept 2026 View ↗ PDF 23R PROPOSED REAR ELEVATION Drawing · 29 Sept 2026 View ↗ PDF 24R PROPOSED RIGHT SIDE ELEVATION Drawing · 29 Sept 2026 View ↗ PDF 25R PROPOSED LEFT SIDE ELEVATION Drawing · 29 Sept 2026 View ↗ PDF 26R PROPOSED SECTION A-A Drawing · 29 Sept 2026 View ↗ PDF 08R 17R APPROVED PLANNING DRAWINGS(PAGE01) Drawing · 29 Sept 2026 View ↗ PDF 08R 17R APPROVED PLANNING DRAWINGS(PAGE02) Drawing · 29 Sept 2026 View ↗ PDF 08R 17R APPROVED PLANNING DRAWINGS(PAGE03) Drawing · 29 Sept 2026 View ↗ PDF 08R 17R APPROVED PLANNING DRAWINGS(PAGE04) Drawing · 29 Sept 2026 View ↗ PDF 08R 17R APPROVED PLANNING DRAWINGS(PAGE05) Drawing · 29 Sept 2026 View ↗ PDF 08R 17R APPROVED PLANNING DRAWINGS(PAGE06) Drawing · 29 Sept 2026 View ↗ PDF 08R 17R APPROVED PLANNING DRAWINGS(PAGE07) Drawing · 29 Sept 2026 View ↗ PDF 08R 17R APPROVED PLANNING DRAWINGS(PAGE08) Drawing · 29 Sept 2026 View ↗ PDF 08R 17R APPROVED PLANNING DRAWINGS(PAGE09) Drawing · 29 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 11

Acton Town Centre conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage at risk: Acton Town Centre, Acton
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Public footpath 18 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Acton
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project 954 m away: Thames Tideway Tunnel
The site is 954 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
3 listed buildings within 150 m
Nearest: Ice House Approximately 100 Feet to South of North Entrance Within Woodland Public Park, Grade II, 56 m away · 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 3 with distances
Historic England ↗
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Designated open space 19 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 21 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area148 m² (1,593 sq ft)
Energy ratingG (asset rating 156)
UseB1 Offices and Workshop businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in May 2013, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Full Application
Postcode
W3 9BY
Received
29 Sept 2026
Validated
29 Sept 2026
Ward
South Acton
Target decision
24 Nov 2026
Applicant
Show
Leaseholder
Show

Decision outlook

Day 55 of the 56-day target. Ealing usually decides changes of use by day 59.

Day 5531 days to the predicted decision (day 86)
47%decided within 8 weeks
54%approved
210decided in the last year

Plota live figures for changes of use decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15253289
Planning Portal ref
PP-15253289
Consultation
20 Nov 2026
Comments by
23 Dec 2026
Site or press notice
2 Dec 2026
Statutory expiry
24 Nov 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Change of use

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.