Vale Of Rheidol Railway, Pontarfynach, SY23 3JL Data via plota.co.uk
Proposal
Raising the station office structure from its original floor footing to a floor level corresponding with the 2014 raised platform level, including provision of new building sub-structure and associated adjustment of yard ground levels; removal of the existing ramped platform access to the station office to improve wheelchair accessibility; reinstatement of the original 1902 external detailing in place of post 1922 great western railway and later alterations, including the replacement of the external circa 1935 gwr gents toilet facility with an external faithful replica of the 1902 gents urinal, containing a contemporary internal fit-out for staff sanitary use. Also an extensive structural repair of the building's timber frame. Data via plota.co.uk
Application progress
This application is under consideration - no decision has been issued yet. Plota predicts a decision around 19 Oct 2026, from Ceredigion's recent commercial and major works.
Documents 11
Statements & assessments 4
Plans & drawings 3
Application forms 1
Site constraints 4
Checked on 29 September 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Ceredigion - and every UK council - as a live feed, an API, or a bulk CSV export.
Important details
- Council
- Ceredigion
- Application type
- Listed Building Consent
- Postcode
- SY23 3JL
- Received
- 25 Aug 2026
- Validated
- 25 Aug 2026
- Ward
- Melindwr ED
- Parish
- Pontarfynach Community
- Case officer
- Show
- Target decision
- 20 Oct 2026
- Decision level
- Dirprwyedig / Delegated
- Applicant
- Show
- Agent
- Vale of Rheidol Railway Ltd
Decision outlook
Day 41 of the 56-day target. Ceredigion usually decides commercial and major works by day 55.
Plota live figures for commercial and major works decided by Ceredigion in the last twelve months, from validation. Ceredigion decision record →
Consultation & key dates
- Statutory expiry
- 20 Oct 2026
Historical activity at this location
6 nearby applications on record - archival context, not part of the live application.
Nearby activity
Track this application
Vale Of Rheidol Railway, Pontarfynach, SY23 3JL
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.