PLN/2025/1675 - Consent under Tree Preservation Orders Approved

Proposal

The felling of a Weeping Ash tree (T1) protected by Milton Keynes Council Tree Preservation Order no. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Aug 2025
✓
Approved
7 Oct 2025

Approved on 7 Oct 2025 · Delegated Decision · Last checked 14 Oct 2026

Site constraints 7

Article 4 direction
Article 4 Direction relating to Houses in Multiple Occupation (HIMO) - Non immediate direction. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Tree preservation order
Consent is needed before work on protected trees.
Not every council has published its orders as open data, so no order shown is not proof there is none.
37 listed buildings within 150 m
Nearest: Westlands (Including Garden Wall to Spring Lane), Grade II, 28 m away · 37 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 37 with distances
Historic England ↗
Conservation area 5 m away: Olney
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Radon affected area, class 2; Inside the Olney built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £385,000 in July 2016. Semi-detached house, freehold.

26 July 2016£385,000
30 July 1999£98,250

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area121 m² (1,302 sq ft)
Energy ratingD (63 out of 100), could reach B
PropertySemi-detached house, 7 habitable rooms
Built1967 to 1975
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in March 2016, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Milton Keynes - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Consent under Tree Preservation Orders
Postcode
MK46 5HS
Received
12 Aug 2025
Validated
12 Aug 2025
Ward
Olney (Historic 2026)
Parish
Olney
Case officer
Show
Target decision
7 Oct 2025
Decision
Approved with Conditions
Decision date
7 Oct 2025
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 56 days from validation, 14 days slower than Milton Keynes's median of 42 for tree and landscaping works. Approved, as 92% of tree and landscaping works here are.

84%decided within 8 weeks
92%approved
194decided in the last year

Plota live figures for tree and landscaping works decided by Milton Keynes in the last twelve months, from validation. Milton Keynes decision record →

Public comments

2comments received
2 neutral

Last counted 14 Oct 2026

Read the comments on the council site ↗

Milton Keynes
Planning Authority Score
7.1/10
Good
#59 of 296 councils
Relevant to this application:
Householder decisions

Milton Keynes is faster than most councils at deciding householder applications, ranking #52 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Milton Keynes decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #156 of 296
92%
Householder approved
Above avg (90%) #159 of 296
78%
Decided in 8 weeks
Above avg (63%) #52 of 296
28%
Extended time limit
Below avg (41%) #45 of 296
55%
Minor dwellings approved
66 decided (1-9 homes)
83%
Major dwellings approved
23 decided (10+ homes)
71%
Change of use approved
49 decided
1,088
Total decisions
134 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.