Land West Of Physics Research Deck University Of Leeds Campus Leeds Data via plota.co.uk

26/06398/FU Current

Proposal

Temporary erection of substation and associated hard landscaping Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 12 Nov 2026
Decision
Expected by 7 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 7 Jan 2027, from Leeds's recent utility and infrastructure works.

Site constraints 7

Woodhouse Lane / University Precinct conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
A4D01. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
9 listed buildings within 150 m
Nearest: School of Education, Grade II, 18 m away · 9 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 9 with distances
Historic England ↗
Also on the record
Radon affected area, class 3; National infrastructure project 95 m away: Calderdale Energy Park, at pre-application; Coalfield, development low risk area; Inside the Leeds (Leeds) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 18 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Leeds - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Leeds
Received
around 12 Nov 2026
Validated
12 Nov 2026

Decision outlook

Day 11 of the 56-day target. Leeds usually decides utility and infrastructure works by day 56.

Day 1145 days to the 56-day target
64%decided within 8 weeks
77%approved
120decided in the last year

Plota live figures for utility and infrastructure works decided by Leeds in the last twelve months, from validation. Leeds decision record →

Public comments

No public comments yet.

Last counted 18 Nov 2026

Read the comments on the council site ↗

Leeds
Planning Authority Score
5.3/10
Average
#131 of 296 overall
Relevant to this application:
Householder decisions

Leeds is faster than most councils at deciding householder applications: #95 of 296 on speed. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Leeds decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #238 of 296
85%
Householder approved
Below avg (90%) #249 of 296
73%
Decided in 8 weeks
Above avg (63%) #95 of 296
33%
Extended time limit
Below avg (41%) #78 of 296
70%
Minor dwellings approved
208 decided (1-9 homes)
86%
Major dwellings approved
36 decided (10+ homes)
68%
Change of use approved
279 decided
3,681
Total decisions
613 refused in the year to March 2026