26/2635/K - Consultation by other Borough\LDDC Decided

Proposal

Variation of Conditions 2, 36 and 39 of planning permission to increase the number of private homes and reduce the number of affordable homes, and to reconfigure internal layouts and external elevations. Accompanied by an Environmental Statement. The description of development of permission dated 01/07/2024 is as follows: 'A hybrid planning application (part detailed, part outline) for the demolition of existing buildings and the comprehensive, mixed-use, re-development of the site, comprising a maximum of 218,991sqm (GEA) of floorspace. Full details are submitted for 526 residential units (Class C3), flexible commercial floorspace, including a new foodstore (17,087sqm GIA - A1-A4/B1/D2), a primary school (D1), community uses (D1), public bus parking and a site wide basement, with associated uses as part of the development including car parking (up to 410 spaces), cycle parking, and an energy centre. Building heights would range between a maximum of 17.4m AOD (3 storeys above ground level) and 60m AOD (15 storeys above ground level). Creation of new vehicular and pedestrian access and public realm works, including all ground floor hard and soft landscaping and other works incidental to the proposals, including a programme of interim works (which include a temporary multi-storey car park with 349 car parking spaces and a temporary access lobby to the retail foodstore). [Detailed Component] Outline permission (with layout, scale, appearance and landscaping at upper levels being reserved) is sought for up to 111,137sqm GEA above podium level, comprising of between 1217 and 1446 residential units (C3), with associated private and communal podium amenity and landscaping, within four buildings with maximum heights ranging between up to 45.850m (AOD)/12 storeys and up to 115.50m (AOD)/32 storeys. [Outline Component]' Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Sept 2026
Decision
Target date was 29 Sept 2026

Under consideration

No decision has been issued yet. A decision is expected by 29 Sept 2026.

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Crossharbour. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: Tower Hamlets APA 3.1
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve about 92 m away: Mudchute Park Farm
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project about 493 m away: Thames Tideway Tunnel
The site is about 493 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, about 1085 m); London Strategic Heat Main Project (at pre-application, about 1366 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Tower Hamlets built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £125,000,000 in July 2018. Other property, freehold.

9 July 2018£125,000,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Consultation by other Borough\LDDC
Postcode
E14 3BT
Received
8 Sept 2026
Validated
8 Sept 2026
Case officer
Show
Target decision
29 Sept 2026
Applicant
Show
Freehold owner
Show

Public comments

No public comments yet.

Last counted 28 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
29 Sept 2026
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 councils
Relevant to this application:
Householder decisions

Greenwich is faster than most councils at deciding householder applications, ranking #76 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026