St Peters Parish Church Mount Park Road Ealing W5 2RU Data via plota.co.uk

264061PTT - Works to a tree with a TPO Pending Consideration

Proposal

T1 - Dying Sycamore - Remove T2 - Horse Chestnut with Ganoderma at base - Reduce by 4 metres T3 - Robinia - Remove dead wood and reshape reminder including 3 metres height reduction. T4 - Purple leaf plum - Reduce by 3 metres. Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since late August on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
6 Nov 2026
Decision
Expected by 1 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 26 Nov 2026 and 4 Dec 2026, from Ealing's recent tree and landscaping works.

Site constraints 9

Grade II* listed: Church of St Peter
List entry 1079390 · 3 m away · 2 more listed buildings within 150 m (2 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 2 with distances
Historic England ↗
Montpelier Park conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Local nature reserve 414 m away: Fox Wood; Inside the Ealing built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Priority habitat 46 m away: Deciduous woodland; Designated open space 46 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 10 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Works to a tree with a TPO
Postcode
W5 2RU
Received
6 Nov 2026
Validated
6 Nov 2026
Ward
Ealing Broadway
Case officer
Show
Target decision
1 Jan 2027
Applicant
Show
Agent
Boward Tree Surgery Ltd

Decision outlook

Day 5 of the 56-day target. Ealing usually decides tree and landscaping works by day 24.

Day 551 days to the 56-day target
98%decided within 8 weeks
97%approved
416decided in the last year

Plota live figures for tree and landscaping works decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 10 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15353299
Planning Portal ref
PP-15353299
Statutory expiry
1 Jan 2027
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026