30-32 The Broadway Southall UB1 1PX Data via plota.co.uk

262073ADV - Advertisement Consent Approved

Proposal

Installation 1 x illuminated projecting sign, 1 x illuminated fascia sign, 2 x illuminated ATM shrouds (Advertisement Consent) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 May 2026
✓
Approved
13 Jul 2026

Approved on 13 Jul 2026 · Delegated Decision · Last checked 8 Sept 2026

Site constraints 8

Archaeological priority area: Likely location of medieval Northcote.
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Southall
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
1 listed building within 150 m; National infrastructure project 494 m away: Expansion of Heathrow Airport (Third Runway), at pre-application; Inside the Ealing built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Advertisement Consent
Postcode
UB1 1PX
Received
19 May 2026
Validated
19 May 2026
Ward
Southall Broadway
Case officer
Show
Target decision
14 Jul 2026
Decision
Grant with Conditions
Decision date
13 Jul 2026
Decision level
Delegated Decision
Applicant
Show
Agent
ADC Consulting
Leaseholder
Show

How this decision compares

Decided in 55 days from validation, about the council's usual 56 days. Approved, as 88% of signs and adverts here are.

56%decided within 8 weeks
88%approved
53decided in the last year

Plota live figures for signs and adverts decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 8 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14946704
Planning Portal ref
PP-14946704
Comments by
22 Jun 2026
Statutory expiry
14 Jul 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Other decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.