25 The Broadway Southall UB1 1JT Data via plota.co.uk

263575ADV - Advertisement Consent Pending Consideration

Proposal

Installation of internally illuminated fascia signage incorporating the Kalyan Jewellers brand identity. The signage is integrated within the fascia band and is positioned on both the front and side elevations of the premises, A large format digital LED wall is proposed within the shopfront (Advertisement Consent) Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
28 Sept 2026
✓
Consultation
20 Nov 2026
Decision
Expected by 23 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision soon after comments close on 14 Dec 2026, from Ealing's recent signs and adverts.

Comments are open until 14 Dec 2026

Comment on this application ↗

Documents 15

All documents on the council site ↗

Site constraints 8

Archaeological priority area: Likely location of medieval Northcote.
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Southall
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
1 listed building within 150 m; National infrastructure project 455 m away: Expansion of Heathrow Airport (Third Runway), at pre-application; Inside the Ealing built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 21 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Advertisement Consent
Postcode
UB1 1JT
Received
28 Sept 2026
Validated
28 Sept 2026
Ward
Southall Broadway
Case officer
Show
Target decision
23 Nov 2026
Applicant
Show
Agent
Ever True Solutions Limited

Decision outlook

Day 56 of the 56-day target. Ealing usually decides signs and adverts by day 56.

Day 5622 days to the predicted decision (day 78)
53%decided within 8 weeks
87%approved
56decided in the last year

Plota live figures for signs and adverts decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15252451
Planning Portal ref
PP-15252451
Consultation
20 Nov 2026
Comments by
14 Dec 2026
Statutory expiry
23 Nov 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Other decisions

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026