17A Harpur Centre Bedford Bedfordshire MK40 1TP Data via plota.co.uk

26/02159/TELLN - Telecommunication licence notification Awaiting decision

Proposal

The Electronic Communications Code, The Electronic Communications Code (Conditions and restrictions) Regulations 2003 (as amended) Regulation 7 & 7A (listed buildings and ancient monuments) and the relevant Planning Acts we hereby notify you, the local planning authority, of BTs intention to install fixed line broadband electronic communications apparatus, detailed as: Cabling External 40m and internal 25m works at CARDFACTORY 17A Harpur Centre Bedford BEDS MK40 1TP Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Nov 2026
Decision
Expected by 2 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 1 Jan 2027 and 18 Jan 2027, from Bedford's recent utility and infrastructure works.

Site constraints 7

Air quality management area: Bedford Town Centre AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
9 listed buildings within 150 m
Nearest: unnamed, 36 m away · 2 Grade II*, 5 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 9 with distances
Historic England ↗
Scheduled monument 133 m away: Remains of the Old George Inn
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Conservation area 37 m away: Bedford; Heritage at risk 37 m away: Bedford; National infrastructure project 420 m away: East West Rail - Bedford to Cambridge and Western improvements, at pre-application; Inside the Bedford built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 12 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area192 m² (2,067 sq ft)
Energy ratingD (asset rating 93)
UseA1/A2 Retail and Financial/Professional services
HeatingAir Conditioning

From the energy performance certificate lodged in February 2016, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Bedford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bedford
Application type
Telecommunication licence notification
Postcode
MK40 1TP
Received
11 Nov 2026
Validated
11 Nov 2026
Ward
Greyfriars
Parish
Bedford Town
Case officer
Show
Target decision
2 Dec 2026
Applicant
Show

Decision outlook

Day 12 of the 56-day target. Bedford usually decides utility and infrastructure works by day 56.

Day 1244 days to the 56-day target
50%decided within 8 weeks
88%approved
64decided in the last year

Plota live figures for utility and infrastructure works decided by Bedford in the last twelve months, from validation. Bedford decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
ONEA92970303
Env. assessment
No
Bedford
Planning Authority Score
2.4/10
Poor
#253 of 296 overall
Relevant to this application:
Householder decisions

Bedford is slower than most councils at deciding householder applications: #201 of 296 on speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bedford decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #259 of 296
86%
Householder approved
Below avg (90%) #239 of 296
56%
Decided in 8 weeks
Below avg (63%) #201 of 296
52%
Extended time limit
Above avg (41%) #233 of 296
52%
Minor dwellings approved
109 decided (1-9 homes)
69%
Major dwellings approved
26 decided (10+ homes)
67%
Change of use approved
57 decided
993
Total decisions
203 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.