Verge At Ingoldmells Road And A158, Burgh Le Marsh Skegness PE24 5HJ Data via plota.co.uk

03616/25/FUL - Full Planning Permission Approved

Proposal

Planning Permission - Installation of 4no. micro energy (battery) storage units with 2.4m high palisade fencing compound. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Nov 2025
✓
Validated
13 Nov 2025
✓
Consultation
16 Apr 2026
✓
Approved
14 May 2026

Approved on 14 May 2026 · Delegated Decision · Last checked 7 Oct 2026

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 761 m away: Triton Knoll Electrical System
The site is about 761 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Outer Dowsing Offshore Wind (Generating Station) (decided, about 1.4 km); Grimsby to Walpole (at pre-application, about 855 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
PE24 5HJ
Received
10 Nov 2025
Validated
13 Nov 2025
Case officer
Show
Target decision
15 May 2026
Decision
Approved
Decision date
14 May 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 182 days from validation, 118 days slower than East Lindsey's median of 64 for full applications. Approved, as 93% of full applications here are.

42%decided within 8 weeks
93%approved
526decided in the last year

Plota live figures for full applications decided by East Lindsey in the last twelve months, from validation. East Lindsey decision record →

Public comments

1comment received
1 objecting

5 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14477841
Planning Portal ref
PP-14477841
Neighbours
20 Nov 2025
Consultation
16 Apr 2026
Comments by
8 May 2026
Statutory expiry
8 Jan 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 overall
Relevant to this application:
Householder decisions

East Lindsey is #182 of 296 councils on householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026