Land Adjacent The Poplars Ingoldmells Road Burgh Le Marsh Lincolnshire Data via plota.co.uk

01314/26/FUL - Full Planning Permission Awaiting decision

Proposal

Planning Permission - Change of use of existing site to form a builder's yard in connection with existing business. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Aug 2026
✓
Validated
1 Sept 2026
✓
Consultation
7 Sept 2026
Decision
Expected by 27 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 26 Oct 2026 and 5 Nov 2026, from East Lindsey's recent changes of use.

The consultation period closed on 28 Sept 2026.

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project about 1054 m away: Triton Knoll Electrical System
The site is about 1054 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Outer Dowsing Offshore Wind (Generating Station) (decided, about 1694 m); Grimsby to Walpole (at pre-application, about 1149 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Burgh le Marsh built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Received
13 Aug 2026
Validated
1 Sept 2026
Ward
Burgh Le Marsh Ward
Parish
Burgh Le Marsh
Target decision
27 Oct 2026
Applicant
Show
Agent
ARN Architectural LTD

Decision outlook

Day 38 of the 56-day target. East Lindsey usually decides changes of use by day 56.

Day 3818 days to the 56-day target
52%decided within 8 weeks
91%approved
102decided in the last year

Plota live figures for changes of use decided by East Lindsey in the last twelve months, from validation. East Lindsey decision record →

Public comments

No public comments yet.

1 neighbour consulted · Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
7 Sept 2026
Consultation
7 Sept 2026
Comments by
28 Sept 2026
Site or press notice
7 Sept 2026
Statutory expiry
27 Oct 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 councils
Relevant to this application:
Change of use

East Lindsey ranks #182 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026