Castle View, Abbey Hill, Netley Abbey Data via plota.co.uk

NC/26/102262 - TPO Approved

Proposal

1 No. Sycamore - Fell. The tree has been identified by the arborist as being multi-stemmed with fungal growth and decay at the base, with weak unions being visible. It is leaning towards the building which is 6-7 metres away. We have been advised to have the tree removed. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Oct 2026
✓
Approved
17 Nov 2026

Approved on 17 Nov 2026 · Delegated Decision · Last checked 17 Nov 2026

Site constraints 7

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Netley Abbey conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Local nature reserve about 105 m away: Solent & Southampton Water
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 104 m away: Lee-on-The Solent to Itchen Estuary SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Scheduled monument about 241 m away: Netley Abbey; Priority habitat about 0 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Eastleigh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Eastleigh
Application type
TPO
Received
7 Oct 2026
Validated
7 Oct 2026
Ward
Hamble & Netley Ward
Parish
Hound CP
Target decision
18 Nov 2026
Decision
Raise No Objection To
Decision date
17 Nov 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 41 days from validation, about the council's usual 42 days. Approved, as 92% of tree and landscaping works here are.

97%decided within 8 weeks
92%approved
397decided in the last year

Plota live figures for tree and landscaping works decided by Eastleigh in the last twelve months, from validation. Eastleigh decision record →

Consultation & key dates

Comments by
6 Nov 2026
Eastleigh
Planning Authority Score
6.8/10
Good
#67 of 296 overall
Relevant to this application:
Householder decisions

Eastleigh is faster than most councils at deciding householder applications: #94 of 296 on speed. Only 27% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Eastleigh decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #111 of 296
92%
Householder approved
Above avg (90%) #153 of 296
73%
Decided in 8 weeks
Above avg (63%) #94 of 296
27%
Extended time limit
Below avg (41%) #40 of 296
63%
Minor dwellings approved
30 decided (1-9 homes)
67%
Major dwellings approved
9 decided (10+ homes)
91%
Change of use approved
11 decided
547
Total decisions
55 refused in the year to March 2026