APP/25/00884 - Consent under Tree Preservation Orders Approved

Proposal

Re-pollard 6 lime trees in front garden back to where previously pollarded to let more light into property. Within G2 subject to TPO 1630 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Sept 2025
✓
Approved
3 Dec 2025

Approved on 3 Dec 2025 · Delegated Decision · Last checked 12 Oct 2026

Site constraints 7

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 853 m away: AQUIND Interconnector
The site is 853 m from the project boundary. Electricity line, awaiting the Secretary of State's decision.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Tree preservation order 7 m away: 1630; Inside the Waterlooville built-up area; Priority habitat 33 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £800,000 in January 2021. Detached house, freehold.

29 January 2021£800,000
5 March 2010£530,000
27 September 1996£220,000New build

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area200 m² (2,153 sq ft)
Energy ratingC (71 out of 100)
PropertyDetached house, 7 habitable rooms
Built1991 to 1995
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in May 2019, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Havant - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Havant
Application type
Consent under Tree Preservation Orders
Postcode
PO7 7SB
Received
15 Sept 2025
Validated
15 Sept 2025
Ward
Waterloo
Case officer
Show
Target decision
10 Nov 2025
Decision
Approve with Conditions
Decision date
3 Dec 2025
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 79 days from validation, 27 days slower than Havant's median of 52 for tree and landscaping works. Approved, as 86% of tree and landscaping works here are.

56%decided within 8 weeks
86%approved
242decided in the last year

Plota live figures for tree and landscaping works decided by Havant in the last twelve months, from validation. Havant decision record →

Public comments

No public comments yet.

Last counted 12 Oct 2026

Read the comments on the council site ↗

Havant
Planning Authority Score
3/10
Poor
#235 of 296 overall
Relevant to this application:
Householder decisions

Havant is one of the slowest councils in England for householder decisions: #283 of 296 on speed. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Havant decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #39 of 296
95%
Householder approved
Above avg (90%) #78 of 296
31%
Decided in 8 weeks
Below avg (63%) #283 of 296
59%
Extended time limit
Above avg (41%) #264 of 296
82%
Minor dwellings approved
17 decided (1-9 homes)
57%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
21 decided
408
Total decisions
26 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.