Fendale Church Lane Croft Lincolnshire PE24 4RU Data via plota.co.uk

01307/26/ESR - EIA - Screening Option Approved

Proposal

Environmental Impact Assessment (E.E.C. Directive .E.C. as amended by Council Directive .C.) for a screening opinion with respect to the proposed erection of 4no. holiday lodges, commercial fishing lake, stable block, reception building and associated amenities. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Aug 2026
✓
Approved
1 Sept 2026

Approved on 1 Sept 2026 · Last checked 2 Sept 2026

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 856 m away: Outer Dowsing Offshore Wind (Generating Station)
The site is 856 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Triton Knoll Electrical System (decided, 1763 m); Grimsby to Walpole (at pre-application, 69 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Priority habitat 26 m away: Coastal and floodplain grazing marsh.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
EIA - Screening Option
Postcode
PE24 4PA
Received
12 Aug 2026
Validated
12 Aug 2026
Ward
Croft Ward
Parish
Croft
Case officer
Show
Target decision
1 Sept 2026
Decision
Not required
Decision date
1 Sept 2026
Applicant
Show
Agent
Neil Dowlman Architecture,

How this decision compares

Decided in 20 days from validation, 36 days faster than East Lindsey's median of 56 for commercial and major works. Approved, as 96% of commercial and major works here are.

52%decided within 8 weeks
96%approved
72decided in the last year

Plota live figures for commercial and major works decided by East Lindsey in the last twelve months, from validation. East Lindsey decision record →

Public comments

No public comments yet.

Last counted 2 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
1 Sept 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 councils
Relevant to this application:
Householder decisions

East Lindsey ranks #182 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use