The Conifers Country Park The Conifers Church Lane Croft Lincolnshire PE24 4RU Data via plota.co.uk

01826/26/FUL - Full Planning Permission Awaiting decision

Proposal

Planning Permission - Change of use of land for the siting of 26no. static holiday caravans and construction of an internal access road. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Oct 2026
✓
Validated
10 Nov 2026
✓
Consultation
17 Nov 2026
Decision
Expected by 9 Feb 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 5 Jan 2027 and 16 Jan 2027, from East Lindsey's recent changes of use.

Comments are open until 16 Dec 2026

Comment on this application ↗

Documents 2

Statements & assessments 2

PDF Objector’s name hidden Show Objection Comment · 16 Oct 2026 View ↗
PDF Objector’s name hidden Show Objection Comment · 16 Oct 2026 View ↗

All documents on the council site ↗

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Priority habitat: Coastal and floodplain grazing marsh
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 850 m away: Outer Dowsing Offshore Wind (Generating Station)
The site is 850 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Triton Knoll Electrical System (decided, 1.7 km); Grimsby to Walpole (at pre-application, 71 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 11 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £307,500 in April 2008. Detached house, freehold.

4 April 2008£307,500

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
PE24 4RU
Received
15 Oct 2026
Validated
10 Nov 2026
Ward
Croft Ward
Parish
Croft
Target decision
9 Feb 2027
Applicant
Show
Agent
Clover Planning And Design,

Decision outlook

Day 13 of the 56-day target. East Lindsey usually decides changes of use by day 56.

Day 1343 days to the 56-day target
53%decided within 8 weeks
92%approved
118decided in the last year

Plota live figures for changes of use decided by East Lindsey in the last twelve months, from validation. East Lindsey decision record →

Public comments

No public comments yet.

Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
17 Nov 2026
Comments by
16 Dec 2026
Site or press notice
25 Nov 2026
Statutory expiry
9 Feb 2027
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 overall
Relevant to this application:
Change of use

East Lindsey is #182 of 296 councils on householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.