Agricultural Barn Churchfield Road Tewin Hertfordshire Data via plota.co.uk

Proposal

Change of use of agricultural barn to one bedroom short-term holiday accommodation. Alterations to openings and installation of wood burner and flue Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Jun 2026
✓
Validated
21 Jul 2026
Decision
Expected by 15 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 80.

The consultation period closed on 20 Aug 2026.

Documents 22

Consultation & comments 5

PDF Commenter’s name hidden Show Neighbour Correspondence · 3 Aug 2026 View ↗
PDF Commenter’s name hidden Show Neighbour Correspondence · 3 Aug 2026 View ↗
PDF Commenter’s name hidden Show Neighbour Correspondence · 30 Jul 2026 View ↗
PDF Commenter’s name hidden Show Neighbour Correspondence · 29 Jul 2026 View ↗
PDF HISTORIC ENVIRONMENT 27/7/26 Consultee Correspondence · 27 Jul 2026 View ↗

All documents on the council site ↗

Site constraints 6

Grade I listed: Church of St Peter
List entry 1341477 · The pin is inside its outline · 5 more listed buildings within 150 m (5 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 5 with distances
Historic England ↗
Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; SSSI 411 m away: Tewinbury SSSI.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Hertfordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Received
17 Jun 2026
Validated
21 Jul 2026
Ward
Hertford Rural
Parish
Tewin Parish Council
Case officer
Show
Target decision
15 Sept 2026
Applicant
Show
Agent
Alison Young Planning Associates Ltd

Decision outlook

Day 80, past the statutory target. 83% of agricultural works in East Hertfordshire are decided within thirteen weeks, which runs to 20 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 8 Oct 2026.

Day 8024 days past the 56-day target
64%decided within 8 weeks
67%approved
43decided in the last year

Plota live figures for agricultural works decided by East Hertfordshire in the last twelve months, from validation. East Hertfordshire decision record →

Public comments

6comments received
1 objecting1 neutral4 supporting

67% support · above the UK average of 16%

6 neighbours consulted · Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15015534
Planning Portal ref
PP-15015534
Comments by
20 Aug 2026
Statutory expiry
15 Sept 2026
Env. assessment
No
East Hertfordshire
Planning Authority Score
4.9/10
Below average
#152 of 296 councils
Relevant to this application:
Change of use

East Hertfordshire is faster than most councils at deciding householder applications, ranking #93 out of 296. East Hertfordshire is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
East Hertfordshire decision statistics
Based on MHCLG data, the year to March 2026
81%
Overall approval rate
Below avg (87%) #256 of 296
84%
Householder approved
Below avg (90%) #256 of 296
73%
Decided in 8 weeks
Above avg (63%) #93 of 296
36%
Extended time limit
Below avg (41%) #109 of 296
53%
Minor dwellings approved
128 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
94%
Change of use approved
36 decided
1,184
Total decisions
223 refused in the year to March 2026