44 Clovelly House High Street Sidmouth Devon EX10 8EJ Data via plota.co.uk

25/2225/LBC - Listed Building Consent Approved

Proposal

Proposed placement of commemorative blue plaque on front elevation. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 10 Nov 2025
✓
Approved
20 Feb 2026

Approved on 20 Feb 2026 · Delegated Decision · Last checked 10 Oct 2026

Site constraints 9

Grade II listed: Clovelly House
List entry 1288050 · 1 m away · 23 more listed buildings within 150 m (23 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 23 with distances
Historic England ↗
Sidmouth Town Centre conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Public footpath 22 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Special area of conservation 288 m away: Sidmouth to West Bay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI 288 m away: Sidmouth to Beer Coast SSSI; Radon affected area, class 2; National landscape 450 m away: East Devon; Inside the Sidmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Listed Building Consent
Postcode
EX10 8EJ
Received
around 10 Nov 2025
Validated
10 Nov 2025
Ward
Sidmouth Town
Parish
Sidmouth
Target decision
20 Feb 2026
Decision
Approval with conditions
Decision date
20 Feb 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 102 days from validation, 40 days slower than East Devon's median of 62 for listed building works. Approved, as 96% of listed building works here are.

40%decided within 8 weeks
96%approved
174decided in the last year

Plota live figures for listed building works decided by East Devon in the last twelve months, from validation. East Devon decision record →

Public comments

No public comments yet.

Last counted 10 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14446744
Planning Portal ref
PP-14446744
Site or press notice
21 Nov 2025
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Other decisions

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use