The Cedars Portway Stratford London E15 3QN Data via plota.co.uk

26/01298/TPO - Works to Trees Subject to a TPO Pending

Proposal

Acacia Tree - Fell to ground level due to disease, with replacement planting. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Jun 2026
Decision
Target date was 10 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 156.

Site constraints 8

Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Newham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Registered park or garden 29 m away: West Ham Park
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
National infrastructure project 922 m away: Thames Tideway Tunnel
The site is 922 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Inside the Newham built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Designated open space 29 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Newham
Application type
Works to Trees Subject to a TPO
Postcode
E15 3QN
Received
15 Jun 2026
Validated
15 Jun 2026
Ward
West Ham
Parish
Forest Gate Community Forum
Case officer
Show
Applicant
Show
Agent
CR Grounds Maintenance Ltd

Decision outlook

Day 156, past the statutory target. 97% of tree and landscaping works in Newham are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 12 Nov 2026.

Day 156100 days past the 56-day target
77%decided within 8 weeks
98%approved
54decided in the last year

Plota live figures for tree and landscaping works decided by Newham in the last twelve months, from validation. Newham decision record →

Public comments

No public comments yet.

Last counted 12 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Newham
Planning Authority Score
3.7/10
Below average
#211 of 296 councils
Relevant to this application:
Householder decisions

Newham ranks #191 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Newham decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #239 of 296
87%
Householder approved
Below avg (90%) #233 of 296
59%
Decided in 8 weeks
Below avg (63%) #191 of 296
39%
Extended time limit
Below avg (41%) #140 of 296
51%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
59%
Change of use approved
51 decided
989
Total decisions
170 refused in the year to March 2026