122 Waltham Way, Chingford, London, E4 8HE Data via plota.co.uk

261222 - Full Planning Assessment

Proposal

Change of use from dwellinghouse (Use Class C3) to residential institution (Use Class C2) for use as a children's home. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 May 2026
✓
Validated
9 Jun 2026
Decision
Target date was 4 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 167.

Site constraints 8

Article 4 direction
Other Article 4 Direction Area. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Waltham Forest AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
SSSI 68 m away: Chingford Reservoirs SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
National infrastructure project 673 m away: North London (Electricity Line) Reinforcement
The site is 673 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: North London Heat and Power Project (decided, 967 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Waltham Forest built-up area; Public transport access: PTAL 1a (very poor), TfL 2023, for the 100 m square; Green belt 68 m away: London.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 6

Last sold for £450,000 in April 2024. Terraced house, freehold.

8 April 2024£450,000Recorded as a transfer outside a standard sale
26 May 2017£425,000
30 October 2012£295,000
5 December 2008£275,000
29 November 2002£249,995
8 September 2000£177,500

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area63 m² (678 sq ft)
Energy ratingD (57 out of 100), could reach B
PropertySemi-detached bungalow, 3 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in January 2023, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Waltham Forest - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning
Postcode
E4 8HE
Received
18 May 2026
Validated
9 Jun 2026
Ward
Valley
Case officer
Show
Target decision
4 Aug 2026
Decision level
Schedule 1 - Delegated
Applicant
Show
Agent
Planners & Architects
Freehold owner
Show

Decision outlook

Day 167, past the statutory target. 71% of changes of use in Waltham Forest are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 167111 days past the 56-day target
52%decided within 8 weeks
50%approved
164decided in the last year

Plota live figures for changes of use decided by Waltham Forest in the last twelve months, from validation. Waltham Forest decision record →

Consultation & key dates

Statutory expiry
4 Aug 2026
Waltham Forest
Planning Authority Score
5.6/10
Average
#116 of 296 overall
Relevant to this application:
Change of use

Waltham Forest is faster than most councils at deciding householder applications: #80 of 296 on speed. Only 22% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Waltham Forest is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.

One of the strictest councils
only 79% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Waltham Forest decision statistics
Based on MHCLG data, the year to March 2026
76%
Overall approval rate
Below avg (87%) #284 of 296
79%
Householder approved
Below avg (90%) #284 of 296
75%
Decided in 8 weeks
Above avg (63%) #80 of 296
22%
Extended time limit
Below avg (41%) #25 of 296
49%
Minor dwellings approved
113 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
50%
Change of use approved
56 decided
1,391
Total decisions
332 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.