29 Marmion Close, Chingford, London, E4 8EN Data via plota.co.uk

Pending 262422
Date received
week of 19 Oct 2026
Postcode
E4 8EN

Description

Prior approval for the construction of a single storey rear extension which would extend 4.00m beyond the rear wall of the existing dwelling, a maximum height of 3.00m and an eaves height of 2.80m. Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision around 13 Dec 2026, from Waltham Forest's recent extensions.

Day 9 of the 56-day target. Waltham Forest usually decides extensions by day 55.

Day 947 days to the 56-day target
84%decided within 8 weeks
80%approved
1,848decided in the last year

Plota live figures for extensions decided by Waltham Forest in the last twelve months, from validation. Waltham Forest decision record →

Site constraints 7

Article 4 direction
Other Article 4 Direction Area. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Waltham Forest AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project about 827 m away: North London (Electricity Line) Reinforcement
The site is about 827 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: North London Heat and Power Project (decided, about 994 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
SSSI about 242 m away: Chingford Reservoirs SSSI; Inside the Waltham Forest built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 27 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Waltham Forest - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Waltham Forest
Planning Authority Score
5.6/10
Average
#116 of 296 councils
Relevant to this application:
Householder decisions

Waltham Forest is faster than most councils at deciding householder applications, ranking #80 out of 296. Only 22% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Waltham Forest is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.

One of the strictest councils
only 79% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Waltham Forest decision statistics
Based on MHCLG data, the year to March 2026
76%
Overall approval rate
Below avg (87%) #284 of 296
79%
Householder approved
Below avg (90%) #284 of 296
75%
Decided in 8 weeks
Above avg (63%) #80 of 296
22%
Extended time limit
Below avg (41%) #25 of 296
49%
Minor dwellings approved
113 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
50%
Change of use approved
56 decided
1,391
Total decisions
332 refused in the year to March 2026