Pageant Gardens Pageant Drive Sherborne Data via plota.co.uk

P/TRC/2026/05260 - Tree Works- Conservation Area Out To Consultation

Proposal

Works as per Pageant Gardens tree work schedule dated 16/05/2025 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Sept 2026
Decision
Expected by 17 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 17 Oct 2026, from Dorset's recent tree and landscaping works.

Comments are open until 16 Oct 2026

Comment on this application ↗

Site constraints 9

Listed building: Pageant Gardens, Sherborne
The pin is inside its outline · 10 more listed buildings within 150 m (8 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 10 with distances
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Parrett Catchment
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Sherborne Conservation Area 1 conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Public footpath 28 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
Registered park or garden 215 m away: Sherborne Castle; Inside the Sherborne built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
Tree Works- Conservation Area
Received
22 Sept 2026
Validated
22 Sept 2026
Ward
Sherborne West Ward
Parish
Sherborne
Case officer
Show
Decision level
Delegated
Applicant
Show

Decision outlook

Day 17 of the 56-day target. Dorset usually decides tree and landscaping works by day 25.

Day 1739 days to the 56-day target
99%decided within 8 weeks
95%approved
1,635decided in the last year

Plota live figures for tree and landscaping works decided by Dorset in the last twelve months, from validation. Dorset decision record →

Consultation & key dates

Comments by
16 Oct 2026
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 councils
Relevant to this application:
Other decisions

Dorset is faster than most councils at deciding householder applications, ranking #51 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026