Field south of Bully House Farm, Embleton, Cockermouth, CA13 9YA Data via plota.co.uk

7/2026/2138 - Full Planning application Application being considered

Proposal

The proposals are for a new agricultural barn to house cattle, including covered midden, hardstanding, associated drainage and landscaping Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Aug 2026
✓
Validated
18 Aug 2026
✓
Consultation
5 Sept 2026
Decision
Expected by 29 Sept 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Oct 2026, from Lake District's recent agricultural works.

Site constraints 15

Water Supply and WasteArea of special control for advertsRisk of Flooding from Surface WaterRisk of Flooding from Rivers and SeaTrunk roadMineral Safeguarding AreaNutrient Neutrality Catchment
Nutrient neutrality catchment: River Derwent & Bassenthwaite Lake SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Lake District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
World heritage site: The English Lake District
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Priority habitat: No main habitat but additional habitats present
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 5
Very poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Restorable Habitat
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Water Supply and WasteCouncil record
Recorded by the council for this site.
Council site ↗
Area of special control for advertsCouncil record
Recorded by the council for this site.
Council site ↗
Risk of Flooding from Surface WaterCouncil record
Recorded by the council for this site.
Council site ↗
Risk of Flooding from Rivers and SeaCouncil record
Recorded by the council for this site.
Council site ↗
Trunk roadCouncil record
Recorded by the council for this site.
Council site ↗
Mineral Safeguarding AreaCouncil record
Recorded by the council for this site.
Council site ↗
Nutrient Neutrality CatchmentCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Lake District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning application
Postcode
CA13 9YA
Received
5 Aug 2026
Validated
18 Aug 2026
Ward
Bothel and Wharrels Ward
Parish
Embleton and District
Case officer
Show
Target decision
29 Sept 2026
Applicant
Show
Agent
Crosby Granger Architects

Decision outlook

Day 52, past Lake District's usual 49 days for agricultural works. 88% are decided within thirteen weeks, so most likely by 17 Nov 2026.

Day 524 days to the 56-day target
68%decided within 8 weeks
89%approved
10%go to committee

Plota live figures for agricultural works decided by Lake District in the last twelve months, from validation. Lake District decision record →

Consultation & key dates

Alt. reference
PP-15093806
Site or press notice
5 Sept 2026
Statutory expiry
15 Sept 2026