Hyde Park Serpentine Road London W2 2UH Data via plota.co.uk

25/09350/FULL - Full Planning Permission Application Approved

Proposal

Use of the Parade Ground area of Hyde Park for the British Summer Time Concert event, including associated structures, for a temporary two year period between: 25 June 2026 and 12 July 2026 with site set up and clearance between 3 June 2026 and 23 July 2026; and 24 June 2027 and 11 July 2027 with site set up and clearance between 2 June 2027 and 22 July 2027. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Dec 2025
✓
Approved
4 Jun 2026

Approved on 4 Jun 2026 · Complex Delegated Decision · Last checked 4 Oct 2026

Documents 74

Statements & assessments 21

PDF TRP ARBORICULTURAL POLICY: TREES AND EVENTS Background Papers · 22 Apr 2026 View ↗ PDF HERITAGE STATEMENT Heritage Statement · 25 Mar 2026 View ↗ PDF LOCAL FLOOD AUTHORITY Consultee Comment · 2 Mar 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT Design and Access Statement · 25 Feb 2026 View ↗ PDF AEGP ECONOMIC IMPACT ASSESSMENT 2024 - BST Background Papers · 24 Dec 2025 View ↗ PDF ECOLOGICAL ASSESSMENT Background Papers · 24 Dec 2025 View ↗ PDF TRP ARBORICULTURAL POLICY DOCUMENT TREES AND EVENTS 2023 Superseded document · 24 Dec 2025 View ↗ PDF BST HYDE PARK ENERGY AND EMISSIONS STATEMENT Report · 24 Dec 2025 View ↗ PDF SUSTAINABILITY REPORT - BST 2024 Report · 24 Dec 2025 View ↗ PDF SUSTAINABLE EVENTS GUIDANCE_ 191225 Background Papers · 24 Dec 2025 View ↗ PDF FLOOD RISK ASSESSMENT Flood risk assessment · 24 Dec 2025 View ↗ PDF FLOOD PLAN APPENDIX A - MAPPING REDUCED SIZE-1-5 Drawing · 24 Dec 2025 View ↗ PDF FLOOD PLAN APPENDIX A - MAPPING REDUCED SIZE-6-10 Drawing · 24 Dec 2025 View ↗ PDF FLOOD PLAN APPENDIX A - MAPPING REDUCED SIZE-11-15 Drawing · 24 Dec 2025 View ↗ PDF FLOOD PLAN APPENDIX A - MAPPING REDUCED SIZE-16-22 Drawing · 24 Dec 2025 View ↗ PDF FLOOD PLAN APPENDIX B - HYDE PARK SERVICES 2023 ALL SERVICES Drawing · 24 Dec 2025 View ↗ PDF FLOOD PLAN APPENDIX C - HYDE PARK PARADE GROUND TOPOGRAPHIC SURVEY 23 ONE SHEET Drawing · 24 Dec 2025 View ↗ PDF FIRE RISK ASSESSMENT Background Papers · 24 Dec 2025 View ↗ PDF THE ROYAL PARKS ETHICAL STATEMENT Report · 24 Dec 2025 View ↗ PDF SUSTAINABILITY ARRIVAL FORM COPY Report · 24 Dec 2025 View ↗ PDF HYDE PARK - PLANNING STATEMENT Background Papers · 24 Dec 2025 View ↗

Other documents 30

PDF ECNSLT-INTERNAL CONSULTS Background Papers · 27 Apr 2026 View ↗ PDF PARADE GROUND EVENT SITE RISK ZONES Background Papers · 22 Apr 2026 View ↗ PDF CNSLT-LA SOC (AMENDMENTS) Background Papers · 26 Mar 2026 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 26 Mar 2026 View ↗ PDF ACK-GENERAL LETTER (G/P/C) Background Papers · 18 Feb 2026 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 18 Feb 2026 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 18 Feb 2026 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 18 Feb 2026 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 18 Feb 2026 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 18 Feb 2026 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 18 Feb 2026 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 18 Feb 2026 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 18 Feb 2026 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 18 Feb 2026 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 18 Feb 2026 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 18 Feb 2026 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 18 Feb 2026 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 18 Feb 2026 View ↗ PDF SITE NOTICE 21 OR 28 DAYS IF T&C APPL. Background Papers · 18 Feb 2026 View ↗ PDF SITE NOTICE 21 OR 28 DAYS IF T&C APPL. Background Papers · 18 Feb 2026 View ↗ PDF SITE NOTICE 21 OR 28 DAYS IF T&C APPL. Background Papers · 18 Feb 2026 View ↗ PDF RECEIPT OF APPLICATION Other · 17 Feb 2026 View ↗ PDF WASTE MANAGEMENT Background Papers · 24 Dec 2025 View ↗ PDF PARK PROTECTION V1 Superseded document · 24 Dec 2025 View ↗ PDF TREE PROTECTION - V01 Report · 24 Dec 2025 View ↗ PDF PARADE GROUND EVENT SITE TREE RISK ZONES 2025 Superseded document · 24 Dec 2025 View ↗ PDF THE HYDE PARK EVENT VEHICLE AND BUGGY ESCORT GUIDANCE DOCUMENT (APRIL 2023) Background Papers · 24 Dec 2025 View ↗ PDF PREMISES LICENCE - 8275619 Background Papers · 24 Dec 2025 View ↗ PDF THE ROYAL PARKS - HYDE PARK - SOUND MANAGEMENT POLICY - VERSION 8 -2023 Report · 24 Dec 2025 View ↗ PDF SUMMER CONCERTS - COVER LETTER Background Papers · 24 Dec 2025 View ↗

All documents on the council site ↗

Site constraints 11

Metropolitan Open Land
Green belt level protection inside London.
The London Plan gives Metropolitan Open Land the same protection as green belt: inappropriate development needs very special circumstances.
Registered park or garden: Hyde Park
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Royal Parks conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Article 4 Basement Development Permitted Rights Removed. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Archaeological priority area: City of Westminster APA 2.3
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Wood pasture and parkland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
National infrastructure project 513 m away: London Strategic Heat Main Project, at pre-application; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission Application
Postcode
W2 2UH
Received
24 Dec 2025
Validated
24 Dec 2025
Ward
Hyde Park
Case officer
Show
Target decision
5 Jun 2026
Decision
Application Permitted
Decision date
4 Jun 2026
Decision level
Complex Delegated Decision
Agent
Turley

How this decision compares

Decided in 162 days from validation, 98 days slower than Westminster's median of 64 for full applications. Approved, as 86% of full applications here are.

40%decided within 8 weeks
86%approved
1,349decided in the last year

Plota live figures for full applications decided by Westminster in the last twelve months, from validation. Westminster decision record →

Public comments

1comment received
1 neutral

438 neighbours consulted · Last counted 4 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14578792
Planning Portal ref
PP-14578792
Comments by
18 Mar 2026
Site or press notice
25 Feb 2026
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026