Malthouse Cottages Jefferies Lane Worthing West Sussex Data via plota.co.uk

AWDM/1590/25 - Work to Trees in Conservation Area Registered

Proposal

Section 211 Notice under the Town and Country Planning Act 1990 to reduce crown height by up to 2.5 metres and associated work, one Bay tree T1 in the Goring Conservation Area. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Dec 2025
✓
Consultation
15 Jan 2026
Decision
Target date was 2 Feb 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 331.

The consultation period closed on 12 Feb 2026.

Site constraints 4

Goring conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
2 listed buildings within 150 m of the postcode pin
Nearest: Jefferies House, Grade II, about 35 m from the postcode pin · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Also on the record
Radon affected area, class 3; Inside the Worthing built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Adur - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Adur
Application type
Work to Trees in Conservation Area
Received
22 Dec 2025
Validated
22 Dec 2025
Ward
Goring
Case officer
Show
Target decision
2 Feb 2026
Applicant
Show
Agent
the urban surgeons

Decision outlook

Day 331, past the statutory target. 62% of tree and landscaping works in Adur are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 14 Nov 2026.

Day 331275 days past the 56-day target
32%decided within 8 weeks
100%approved
38decided in the last year

Plota live figures for tree and landscaping works decided by Adur in the last twelve months, from validation. Adur decision record →

Public comments

No public comments yet.

7 neighbours consulted · Last counted 14 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14580472
Planning Portal ref
PP-14580472
Neighbours
15 Jan 2026
Consultation
15 Jan 2026
Comments by
12 Feb 2026
Site or press notice
22 Jan 2026
Statutory expiry
2 Feb 2026
Env. assessment
No
Adur
Planning Authority Score
6/10
Average
#103 of 296 councils
Relevant to this application:
Other decisions

Adur ranks #181 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Adur decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #49 of 296
96%
Householder approved
Above avg (90%) #48 of 296
60%
Decided in 8 weeks
Below avg (63%) #181 of 296
38%
Extended time limit
Below avg (41%) #125 of 296
70%
Minor dwellings approved
20 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
100%
Change of use approved
5 decided
298
Total decisions
20 refused in the year to March 2026