50 Twemlow Avenue Poole BH14 8AN Data via plota.co.uk

P/26/03347/TTPO - Tree work to tree/s subject to a TPO Approved

Proposal

T1 Quercus Robur - Fell to ground level. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Jul 2026
✓
Approved
25 Sept 2026

Approved on 25 Sept 2026 · Delegated · Last checked 26 Sept 2026

Site constraints 9

Nutrient neutrality catchment: Poole Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Registered park or garden about 36 m away: Poole Park
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
Conservation area about 36 m away: Poole Park; Nature improvement area: Wild Purbeck; Ramsar wetland about 392 m away: Poole Harbour; SSSI about 393 m away: Poole Harbour SSSI; Inside the Poole built-up area; Priority habitat about 36 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in BCP - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
BCP
Application type
Tree work to tree/s subject to a TPO
Postcode
BH14 8AN
Received
17 Jul 2026
Validated
17 Jul 2026
Ward
Parkstone
Parish
Poole Town Council
Case officer
Show
Decision
Granted
Decision date
25 Sept 2026
Decision level
Delegated
Applicant
Show
Agent
MM Tree Services

How this decision compares

Decided in 70 days from validation, 10 days slower than BCP's median of 60 for tree and landscaping works. Approved, as 95% of tree and landscaping works here are.

40%decided within 8 weeks
95%approved
2,276decided in the last year

Plota live figures for tree and landscaping works decided by BCP in the last twelve months, from validation. BCP decision record →

BCP
Planning Authority Score
1.7/10
Poor
#279 of 296 overall
Relevant to this application:
Householder decisions

BCP is slower than most councils at deciding householder applications: #256 of 296 on speed. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
BCP decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #233 of 296
88%
Householder approved
Below avg (90%) #214 of 296
44%
Decided in 8 weeks
Below avg (63%) #256 of 296
60%
Extended time limit
Above avg (41%) #267 of 296
67%
Minor dwellings approved
346 decided (1-9 homes)
68%
Major dwellings approved
56 decided (10+ homes)
81%
Change of use approved
78 decided
2,244
Total decisions
392 refused in the year to March 2026