Wallend Farm Lower Road Minster-On-Sea Kent ME12 3RR Data via plota.co.uk

26/504045/FULL - Full Awaiting decision

Proposal

Change of use of existing commercial grain store to Class B2/ B8 use (general industrial/storage and distribution). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 26 Oct 2026
Decision
Expected by 21 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 24 Dec 2026 and 13 Jan 2027, from Swale's recent changes of use.

Site constraints 6

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Special protection area 359 m away: The Swale; Nature improvement area: Greater Thames Marshes; SSSI 359 m away: The Swale SSSI.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Swale - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Swale
Application type
Full
Postcode
ME12 3RR
Received
around 26 Oct 2026
Validated
26 Oct 2026
Ward
Sheppey Central
Parish
Minster-On-Sea
Case officer
Show
Target decision
21 Dec 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Refine Architecture Ltd

Decision outlook

Day 28 of the 56-day target. Swale usually decides changes of use by day 70.

Day 2842 days to the predicted decision (day 70)
39%decided within 8 weeks
74%approved
56decided in the last year

Plota live figures for changes of use decided by Swale in the last twelve months, from validation. Swale decision record →

Consultation & key dates

Alt. reference
PP-15311740
Planning Portal ref
PP-15311740
Statutory expiry
21 Dec 2026
Env. assessment
No
Swale
Planning Authority Score
2.3/10
Poor
#263 of 296 overall
Relevant to this application:
Change of use

Swale is one of the slowest councils in England for householder decisions: #275 of 296 on speed. The council extends the time limit on 70% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Swale decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #143 of 296
94%
Householder approved
Above avg (90%) #120 of 296
37%
Decided in 8 weeks
Below avg (63%) #275 of 296
70%
Extended time limit
Above avg (41%) #286 of 296
72%
Minor dwellings approved
81 decided (1-9 homes)
84%
Major dwellings approved
25 decided (10+ homes)
95%
Change of use approved
22 decided
658
Total decisions
71 refused in the year to March 2026