P2025/0999/OBS - Observations to Adjoining Borough FINAL DECISION

Proposal

Observations to adjoining borough on application ref: for Demolition of the existing buildings (with part retention of the existing basemement and foundations) and the construction of a new building of ground plus 45 storeys (with basements) for use as offices (Class E (g)), flexible commercial and cultural uses (Use Classes E (a/b/c), F1, F2), multi-functional spaces (sui generis) and a public lavatory (sui generis); the creation of a series of external walkways and terraces at the lower levels; public realm and highways works; the excavation and re-landscaping of the former churchyard of St Augustine Papey; the excavation and provision of visual access to the remains of the Roman Wall; ancillary plant, servicing and parking and all associated works with the proposed development Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Apr 2025
Decision
Target date was 16 Jun 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 575.

Site constraints 14

Critical Drainage Group3_003Central Activities Zone
Scheduled monument: London Wall: remains of Roman wall and bastion, Camomile Street
Scheduled monument consent is needed for any work to it, separate from planning permission.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 671 m away: Thames Tideway Tunnel
The site is 671 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 10 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
18 listed buildings within 150 m
Nearest: No. 38, ST MARY AXE, Grade II, 57 m away · 3 Grade I, 2 Grade II*, 12 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 18 with distances
Historic England ↗
Critical Drainage Group3_003Council record
Recorded by the council for this site.
Council site ↗
Central Activities ZoneCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Conservation area 43 m away: Bishopsgate; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 2 m away; Heritage at risk 95 m away: London Wall: remains of Roman and medieval wall from west end of All Hallows Church to 38 Camomile Street; Town centre 90 m away: Liverpool Street.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 9 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area9,628 m² (103,635 sq ft)
Energy ratingB (asset rating 43)
UseOffices and Workshop Businesses
HeatingAir Conditioning

From the energy performance certificate lodged in May 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Islington - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Islington
Application type
Observations to Adjoining Borough
Postcode
EC3A 8AA
Received
22 Apr 2025
Validated
22 Apr 2025
Case officer
Show
Target decision
16 Jun 2025
Decision level
Delegated
Applicant
Show
Leaseholder
Show

Decision outlook

Day 575, past the statutory target. 84% of other in Islington are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 16 Nov 2026.

Day 575519 days past the 56-day target
65%decided within 8 weeks
95%approved
2,215decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in Islington to go on. Islington decision record →

Islington
Planning Authority Score
2.9/10
Poor
#237 of 296 councils
Relevant to this application:
Householder decisions

Islington is slower than most councils at deciding householder applications, ranking #260 out of 296. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Islington decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #132 of 296
93%
Householder approved
Above avg (90%) #130 of 296
43%
Decided in 8 weeks
Below avg (63%) #260 of 296
53%
Extended time limit
Above avg (41%) #241 of 296
89%
Minor dwellings approved
499 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
89%
Change of use approved
19 decided
1,488
Total decisions
167 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.